The plans Adur decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • New Adur Local Plan (Adur Local Plan update)

    Early stage. A Key Issues consultation ran from 26 November 2024 to 5 January 2025 (Consultation Statement, October 2025, under Regulation 22(1)(c) of the 2012 Regulations: https://www.adur-worthing.gov.uk/media/Media,173455,smxx.pdf; Key Issues document: https://www.adur-worthing.gov.uk/media/Media,172360,smxx.pdf). No draft plan has been published. The council has decided to 'progress the preparation of a new local plan under the new national planning system, introduced by the Levelling Up and Regeneration Act 2023', and the Annual Monitoring Report 2024-2025 says this 'would require publication of the Notice to Commence by December 2026' (https://www.adur-worthing.gov.uk/media/Media,173957,smxx.pdf). No notice of intention to commence was found on the council's pages on 7 October 2026. The Local Development Scheme 2025-2028 (March 2025: https://www.adur-worthing.gov.uk/media/Media,98763,smxx.pdf) timetabled scoping from September to December 2025, a draft plan consultation in November to December 2026 and adoption in June 2028; its scoping and Gateway 1 dates have passed without the steps being published. The council's 'Journey to the new Adur Local Plan' page (last updated 16 October 2025) says 'It is anticipated that the new Adur Local Plan will be adopted by the successor authority after local government reorganisation in Sussex', and that it will give 'a long-term vision for the area over a period of 15 years'. It will cover the district outside the South Downs National Park and replace the Adur Local Plan 2017.

Free with any account

Adur’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 9 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Adur?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Adur’s own published plans and pages on 7 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.