Ashfield local plan
The plans Ashfield decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Ashfield Local Plan Review 2002 (saved policies), adopted 22 November 2002, 1991 to 2011
- Nottinghamshire Minerals Local Plan, adopted 25 March 2021, 2018 to 2036
- Nottinghamshire and Nottingham Waste Local Plan, adopted 18 September 2025, 2021 to 2038
Emerging plans
- Ashfield Local Plan 2023 to 2040, 2023 to 2040
At examination, after the main modifications consultation; no Inspectors' report published as at 10 November 2026. Completed steps: Draft Local Plan (Regulation 18) consultation "from the 4 October 2021 to 16 November 2021" (https://www.ashfield.gov.uk/planning-and-building-control/emerging-local-plan/ashfield-draft-local-plan-consultation-regulation-18/); Regulation 19 Pre-Submission Draft (November 2023) consultation "open from 1st December 2023 to 29th January 2024", closing 5pm (FAQ, https://www.ashfield.gov.uk/media/zthfwo0z/regulation-19-local-plan-fequently-asked-questions-a11y.docx); submitted to the Secretary of State "on Monday 29 April 2024" (https://www.ashfield.gov.uk/local-plan-examination/); Inspectors Philip Mileham and Graham Wyatt; Stage 1 hearings 12 to 14 November 2024; interim findings letters of 6 January 2025 (INS05) and 28 January 2025 (INS06) postponing Matters 4 to 12; additional housing site allocations consultation "Thursday 20 February to 5pm on Thursday 3 April 2025"; Stage 2 hearings from 26 November 2025, "concluded the public examination with a closing meeting" on Tuesday 13 January 2026 (https://www.ashfield.gov.uk/local-plan-examination/local-plan-latest-news/); post-hearings letter of 4 February 2026 (INS09, published 10 February 2026, https://www.ashfield.gov.uk/media/2i0p4vnk/ins09-ashfield-local-plan-inspectors-post-hearings-letter-cfi.docx); main modifications consultation "from Wednesday 17 June to Thursday 30 July 2026" (https://www.ashfield.gov.uk/local-plan-examination/main-modifications-consultation/); statement of consultation on the representations and the Local Development Scheme May 2026 (ADC.39) added on 12 October 2026, the latest news item. Next (Local Development Scheme May 2026, Appendix 4, https://www.ashfield.gov.uk/media/uzoll3ub/local-development-scheme-may-2026-1.docx): "Inspector's Report received October 2026"; "Council decision to adopt Local Plan December 2026"; "Formal Adoption December 2026". The October date has passed with no report on the council's pages. The plan's strategic policies are S1 to S15 (INS09: "Policies S1-S15 plus Policies EV1, H1 and EM2"), among them S3 Meeting the Challenge of Climate Change, S4 Green Belt, S5 High Quality Buildings and Places and S6 the Junction 27 employment allocation, which share codes with the August 2026 Framework's S3 to S6, so a citation must name the document.
- Nottinghamshire Minerals Local Plan 2045, to 2045
Early preparation under the Town and Country Planning (Local Planning) (England) Regulations 2026, jointly by Nottinghamshire County Council and Nottingham City Council, to cover "the administrative areas of Nottinghamshire County Council (ONS code E10000024) and Nottingham City Council (ONS code E60000075)" and continue to do so after local government reorganisation in April 2028 (notice, https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/notice-of-intention-to-commence-preparation). Completed steps: notice of intention to commence plan preparation and timetable published 31 July 2026; scoping consultation from 12 October to 5pm on Monday 9 November 2026 (closed the day before this research; https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/new-minerals-local-plan). Planned (timetable, https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/local-plan-timetable; "all dates are subject to change"): call for sites early 2027; Gateway 1 self-assessment 16 April 2027 (when "the councils expect to begin the 30-month plan preparation process"); content and evidence consultation 19 November 2027 to 14 January 2028; Gateway 2 28 April 2028; proposed plan consultation 11 September to 13 November 2028; Gateway 3 26 January 2029; submission 16 March 2029; adoption 20 September 2029. No draft policies yet; the adopted Minerals Local Plan (2021) "will remain in force" until then.
Free with any account
Ashfield’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 10 Article 4 directions, and what each removes
- 2 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Ashfield?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Ashfield’s own published plans and pages on 10 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
