GoPlanner

Councils

Babergh local plan

The plans Babergh decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Babergh and Mid Suffolk Joint Local Plan 2026 – 2045, 1 April 2026 to 31 March 2045

    A new joint plan for both districts under the 2026 plan-making system; "When adopted, it will replace all previous Local Plan documents for both Babergh District Council and Mid Suffolk District Council" (council page, https://www.babergh.gov.uk/planning/planning-policy/new-joint-local-plan). It replaces the Part 2 Plan the JLP Part 1 anticipated. Completed steps: call for sites 5 January to 2 February 2024 and 20 October 2025 to 9 January 2026; Sustainability Appraisal Scoping Report consultation 5 February to 16 March 2026; Local Plan Timetable and Notice of Intention to Commence Local Plan Preparation published Wednesday 3 June 2026 (https://www.babergh.gov.uk/w/notice-of-intention-to-commence-local-plan-preparation); scoping consultation 5 June to 31 July 2026; Gateway 1 self-assessment summary published 21 October 2026: "We started preparing a new Joint Local Plan for Babergh District Council and Mid Suffolk District Council areas on Wednesday 21 October 2026, to cover the plan period from 2026 to 2045" (http://www.babergh.gov.uk/w/gateway-1-self-assessment-summary); SHELAA and Engagement Strategy published October 2026. Timetable (https://www.babergh.gov.uk/local-plan-timetable, revised 21 October 2026): consultation on proposed Local Plan content and evidence 1 June to 1 July 2027; Gateway 2 1 September to 1 October 2027; consultation on the proposed Local Plan 1 February to 1 March 2028; Gateway 3 1 July to 1 August 2028; submission 1 September 2028; examination 1 October 2028 to 1 March 2029; adoption 1 April 2029 (the council lists "the first day of the month for stages where we don't know their exact dates yet"). The Gateway 1 summary says a shorter period to 2040 is being considered. No draft policies or allocations yet; the SHELAA "does not allocate sites for development and it has no planning status".

Free with any account

Babergh’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 4 zones
  • 13 Article 4 directions, and what each removes
  • 34 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Babergh?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Babergh’s own published plans and pages on 6 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.