GoPlanner

Councils

Basildon local plan

The plans Basildon decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Basildon Borough Local Plan (Proposed Submission Draft, growth to 2043), 2023 to 2043

    Regulation 19 publication, closed; to be submitted by 31 December 2026 under a ministerial direction. The council's public notice (published 6 August 2026) invited representations on the "Proposed Submission Draft Basildon Borough Local Plan" under Regulation 19 from 10 August 2026 to 22 September 2026, on https://basildon-lp-reg19.commonplace.is/ (https://publicnoticeportal.uk/notice/planning/6a7472771580766011c555ec). This followed the Minister's direction of 21 July 2026 under section 27 of the 2004 Act to "Commence a Regulation 19 consultation on the emerging plan... by no later than 10 August 2026 for a minimum period of 6 weeks" and to "Submit the emerging plan consulted on under the above direction by no later than 31 December 2026" (https://assets.publishing.service.gov.uk/media/6a5f946234dfb74772f96c8c/Basildon_Borough_Council_local_plan_intervention_letter.pdf). On 26 October 2026 the Minister wrote that the direction "expressly requires the Council to take no steps to withdraw the Plan" and that "Any decision to take steps to withdraw the Plan in defiance of the direction would be unlawful", noting the council's request for an extension to the submission timetable, which "will be considered carefully" (https://assets.publishing.service.gov.uk/media/6adf5d1cb62d80a107bc5d14/Letter_from_Minister_Pennycook_to_Cllr_Andy_Barnes_26_Oct_2026.pdf). Earlier steps (council's Local Plan news page, https://basildon.gov.uk/article/9107/Local-Plan-Latest-news-and-updates): Local Development Scheme 2022-2027 adopted 17 November 2022; Call for Sites 19 October to 14 December 2022; Issues and Options (Regulation 18) consultation 27 June to 5 September 2023; First Draft Local Plan (Regulation 18) consultation 18 November 2024 to 12 January 2025; a second focused draft consultation in February to April 2025; Regulation 18 Part 3 consultation 28 November 2025 to 16 January 2026. Not yet submitted.

  • Replacement Essex Minerals Local Plan 2025 to 2040 (Minerals Local Plan review), 2025 to 2040

    Regulation 18, the latest step found being the second Regulation 18 consultation. Essex County Council's page lists the completed stages: Regulation 18 consultation on proposed amendments to the 2014 plan in March/April 2021; a Call for Sites in February/March 2022; informal engagement on Policy S6 in February/March 2022; a second Call for Sites in September 2022; and a further Regulation 18 public consultation in February and March 2024 (6 February to 9 April 2024, per the existing plan page), re-run from May to July 2024 to include an omitted site. The county's news of 16 May 2024 said an amended plan with a draft list of Preferred Site allocations "will be subject to a further consultation this winter". No later step (Regulation 19, submission, examination) was found on the county's pages.

Free with any account

Basildon’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 1 neighbourhood plan, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Basildon?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Basildon’s own published plans and pages on 30 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.