Bedford Borough Council local plan
The plans Bedford Borough Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Bedford Borough Local Plan 2030, adopted 15 January 2020, 2015 to 2030
- Allocations and Designations Local Plan (saved policies), adopted 17 July 2013, to 2021
- Bedford Borough Local Plan 2002 (saved policies), adopted October 2002
- Minerals and Waste Local Plan: Strategic Sites and Policies, adopted 15 January 2014, to 2028
- Bedfordshire and Luton Minerals and Waste Local Plan (saved policies W17 and W22), adopted January 2005
Emerging plans
- Bedford Borough Local Plan 2050, to 2050
Early preparation, before Gateway 1. The council published its notice that preparation had commenced on 17 April 2026. A call for sites ran from July 2026, extended to 23 November 2026, and a six-week consultation on the plan's priorities, scope and engagement (moved from September-October to October-November 2026) closes at 11.59pm on Monday 23 November 2026. The timetable then gives Gateway 1 in April 2027, consultation on the emerging draft plan in February-March 2028, Gateway 2 in October 2028, consultation on the final draft in January-March 2029, Gateway 3 in March 2029, submission in April 2029, examination April-October 2029 and adoption in November 2029. It replaces the Local Plan 2040, submitted on 12 January 2023 with hearings in June and September 2023, paused from November 2023, and withdrawn from examination by Full Council on 8 October 2025 after the Inspector's letter of 10 June 2025 found "no reasonable way for the examination of the Bedford Local Plan 2040 to continue"; the withdrawal notice is dated 29 October 2025. The council says the withdrawn plan "does not carry any legal weight in planning decisions".
- Bedfordshire Minerals and Waste Plan (joint, to replace the 2014 plan and the saved 2005 policies), to 2050
Scoping consultation, from 9am on 12 October 2026 to 11pm on 27 November 2026 (extended by a week from 20 November).
Free with any account
Bedford Borough Council’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 5 zones
- 2 Article 4 directions, and what each removes
- 25 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Bedford Borough Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Bedford Borough Council’s own published plans and pages on 27 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
