GoPlanner

Councils

Bexley local plan

The plans Bexley decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Review of the Bexley Local Plan (a new local plan for Bexley)

    Pre-preparation. The Local Development Scheme 2025, in effect from 22 March 2025, says 'the Council is currently at the start of the review process' (para 2.7). Its timetable: assessing the current plan March 2025 to March 2027; scoping and early participation April 2027 to March 2028; the 30-month plan-making stage from April 2028; submission March 2030; examination April to September 2030; adoption October 2030. No consultation on a new plan found by 9 November 2026. A provisional 'Identified grey belt land' assessment is published as evidence, not policy.

  • Draft London Plan, to 2050

    Draft published 16 July 2026; consultation closed at 5pm on Thursday, 15 October 2026 (comments on a correction to Table 3.1 accepted until 23 October 2026). The Greater London Authority expects examination in 2027 and adoption in early 2028.

Free with any account

Bexley’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 5 zones
  • 4 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Bexley?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Bexley’s own published plans and pages on 9 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.