GoPlanner

Councils

Bolton local plan

The plans Bolton decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Bolton Local Plan (to 2042), to 2042

    At publication (Regulation 19): the council published the Bolton Local Plan (Publication Version), October 2026, with its Policies Map, for comment from 15 October 2026 until 23:59 on Thursday 26 November 2026 (https://www.bolton.gov.uk/planning-policy-strategy/local-plan; news release of 15 October 2026, https://www.bolton.gov.uk/news/article/2132/have-your-say-on-where-bolton-s-new-homes-and-jobs-will-go). It provides for at least 787 homes a year to 2042 (Places for Everyone's figure) and changes the Green Belt at four places only (Health Innovation Bolton, the Blackrod Employment Cluster, the Logistics North Extension, and land off The Alders, Tonge Moor). After the consultation the council will decide whether to submit it for examination. The Local Development Scheme of October 2026 (https://www.bolton.gov.uk/downloads/file/6412/local-development-scheme-2024) gives submission in Winter 2026, hearings from Spring/Summer 2027 and adoption in Winter 2027. Earlier stages: Call for Sites, 4 March to 15 April 2025; Issues and Options (Regulation 18, first stage) from 21 August 2025; 'Direction of Travel' (Regulation 18 Consultation Part 2), 27 November 2025 to 22 January 2026. It is to replace the parts of the Core Strategy and Allocations Plan that Places for Everyone does not address.

  • Greater Manchester Joint Minerals and Waste Plan

    Not yet formally started. The ten Greater Manchester councils agreed in 2025 to replace the 2012 Waste Plan and the 2013 Minerals Plan with a single joint plan; GMCA says a timetable and formal notice to commence plan-making will be published in due course (from Trafford's entry, researched 1 October 2026; not re-read for Bolton).

Free with any account

Bolton’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 3 Article 4 directions, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • How the plan draws its settlements

Checking a property in Bolton?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Bolton’s own published plans and pages on 8 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.