GoPlanner

Councils

Braintree local plan

The plans Braintree decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Braintree District Local Plan 2043 (Local Plan Review, Submission Draft), 2026/2027 to 2043

    Regulation 19 pre-submission publication, under way: the council's timetable gives "Pre-Submission Consultation (Reg 19)" "23 September - 6 November 2026", and its page says "The consultation closes at 5pm on Friday 6 November 2026." Completed steps (Local Plan 2043 Review Timetable, updated October 2026, https://www.braintree.gov.uk/planning-building-control/local-plan-2043/2, and the Local Plan Review page): the Local Plan Sub Committee decided to start the review on 7 March 2024; call for sites 10 April to 24 May 2024 (late submissions accepted until 16 October 2024); community ideas and issues to 16 August 2024; revised timetable confirmed by the Sub Committee on 16 September 2024; Issues and Options consultation "20 January - 7 March 2025"; Preferred Options consultation (Regulation 18) "3 March - 17 April 2026". Next: "Submission to Planning Inspectorate" "December 2026" ("looking to submit its plan by 31 December 2026"; "Before submission, the Plan will be considered at an additional Full Council meeting"), and "Adoption June 2027". The Regulation 18 news release (3 March 2026) gave a requirement of "1,264 new homes a year".

Free with any account

Braintree’s figures

  • Five-year housing land supply, measured at 31 March 2024
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 2 Article 4 directions, and what each removes
  • 14 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Braintree?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Braintree’s own published plans and pages on 30 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.