Broadland local plan
The plans Broadland decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Greater Norwich Local Plan (The Strategy and The Sites Plan), adopted 28 March 2024, 2018 to 2038
- Broadland Development Management Development Plan Document, adopted 3 August 2015, 2015 to 2026
- Old Catton, Sprowston, Rackheath and Thorpe St Andrew Growth Triangle Area Action Plan, adopted 4 July 2016, to 2026
- Norfolk Minerals and Waste Local Plan 2023-2038, adopted 20 May 2025, 2023 to 2038
Emerging plans
- The Greater Norwich Local Plan 2045, 2025 to 2045
A new joint plan for Broadland, Norwich and South Norfolk under the 2026 plan-making system, excluding the Broads Authority Executive Area. Completed steps: notice of intention to commence published on 30 June 2026 (https://www.southnorfolkandbroadland.gov.uk/planning/future-development/local-plans/emerging-local-plan/review-of-the-greater-norwich-local-plan/broadland-district-council-notice-of-intention-to-commence-local-plan-preparation); call for sites 9 February to 23 March 2026 and 15 June to 13 July 2026; scoping consultation 17 August to 28 September 2026; "The Gateway 1 Self-Assessment was published on the 30th October 2026", which starts the 30-month preparation period. Timetable as published (planning.data.gov.uk, from the councils' data; the councils' own timetable page on greaternorwichdevelopment.org.uk could not be read, behind a Cloudflare challenge): plan content and evidence consultation 8 June to 20 July 2027, Gateway 2 advice sought 2 November 2027, proposed plan consultation 3 April to 29 May 2028, Gateway 3 advice sought 6 September 2028, submission 19 October 2028, adoption 30 April 2029. Required housing in the councils' CSV: 49,210 homes (https://www.southnorfolkandbroadland.gov.uk/asset-library/2026-06-30-csv-local-plan-information.csv). No draft policies yet.
- Local Plan for the Broads (review)
The Broads Authority's plan, for the Broads Authority Executive Area only (part of Broadland). Submitted to the Planning Inspectorate on 16 February 2026; Inspectors L Fleming and S Edwards appointed on 9 March 2026; schedules of modifications published on 20 August 2026; matters, issues and questions issued on 21 September 2026; hearings provisionally in the weeks commencing 1 and 8 February 2027. "Whilst we do this, the policies in the current Local Plan for the Broads are still in place." (Broads Authority pages, read through a fetch tool on 4 November 2026.)
Free with any account
Broadland’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 2 zones
- 21 Article 4 directions, and what each removes
- 27 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Broadland?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Broadland’s own published plans and pages on 4 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
