GoPlanner

Councils

Broxbourne local plan

The plans Broxbourne decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Broxbourne new Local Plan (an update to the Local Plan 2018-2033, under the new plan-making system)

    Early preparation: no consultation on the plan's content yet found. The council's pages say "In September 2025, Broxbourne Council agreed to progress with a new Local Plan for the Borough" (https://www.broxbourne.gov.uk/planning/plans-developments/12). A Call for Sites ran from 5 November 2025 to 7 January 2026 (https://haveyoursay.broxbourne.gov.uk/pl/call-for-sites-autumn-2025/). The Local Development Scheme dated October 2025 (superseding February 2025; https://www.broxbourne.gov.uk/downloads/file/4632/broxbourne-local-development-scheme-october-2025) says "An update to the current Local Plan will be prepared under the Government's proposed new plan-making regulations" and gives: Issues and Options (Regulation 18) May 2026; Draft Local Plan (Regulation 18) May 2027; Publication (Regulation 19) January 2028; Submission (Regulation 22) May 2028; examination hearings (Regulation 24) January 2028 (as printed, before submission); Inspector's report and adoption tbc. As at 2 November 2026 no Issues and Options consultation, notice of intention to commence, scoping consultation or Gateway 1 was found on the council's pages or its consultation portal, whose only open planning item is "Who Decides" (on who decides planning applications, closing 1 December 2026; https://haveyoursay.broxbourne.gov.uk/). Latest completed step: the Call for Sites, closed 7 January 2026.

Free with any account

Broxbourne’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 2 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Broxbourne?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Broxbourne’s own published plans and pages on 2 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.