Bury local plan
The plans Bury decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Places for Everyone Joint Development Plan Document, adopted 21 March 2024, 2022 to 2039
- Bury Unitary Development Plan (saved policies), adopted 29 August 1997
- Greater Manchester Joint Waste Development Plan Document, adopted 1 April 2012, to 2027
- Greater Manchester Joint Minerals Development Plan Document, adopted 26 April 2013, to 2028
Emerging plans
- Bury Local Plan (2022 to 2043), 2022 to 2043
Publication (Regulation 19) consultation closed; submission approved. The council's page says the eight-week consultation on the Publication Local Plan (June 2026, https://www.bury.gov.uk/asset-library/publication-local-plan-june-2026.pdf) ran from 17 July 2026 and 'ended on 11 September 2026'; on 11 November 2026 the Council approved submission of the Plan to the Secretary of State, due by 31 December 2026. No examination or adoption date is given. Earlier stage: Regulation 18 consultation on the first draft, 17 March to 12 May 2025 (https://www.bury.gov.uk/planning-building-control/planning-policy/bury-local-plan/bury-local-plan-previous-stages, not read; dates from the Local Plan page). It is to replace the remaining saved UDP policies, with some 'not being carried forward' (Appendix 1, Table 5).
- Greater Manchester Joint Minerals and Waste Plan
Not yet formally started. The ten Greater Manchester councils agreed in 2025 to replace the 2012 Waste Plan and the 2013 Minerals Plan with a single joint plan; GMCA says a timetable and formal notice to commence plan-making will be published in due course (from Bolton's and Trafford's entries; not re-read for Bury).
Free with any account
Bury’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 3 Article 4 directions, and what each removes
- How the plan draws its settlements
Checking a property in Bury?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Bury’s own published plans and pages on 23 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
