GoPlanner

Councils

Cambridge local plan

The plans Cambridge decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Greater Cambridge Local Plan (Proposed Submission), 2024 to 2045

    Regulation 19 publication, closed; submission due by the end of December 2026. The joint plan of Cambridge City Council and South Cambridgeshire District Council (Greater Cambridge Shared Planning). Completed steps: Call for Sites in 2019; First Conversation (Issues and Options, Regulation 18) in January and February 2020; First Proposals (preferred options, Regulation 18) from 9am on Monday 1 November 2021 to 5pm on Monday 13 December 2021; member decisions on the development strategy and key sites in early 2023; Site Submissions Update in early 2025; Draft Local Plan (Regulation 18) consultation from 1 December 2025 to 30 January 2026; updated Proposed Submission plan published on 8 July 2026; Cambridge City Council's Cabinet approved the Proposed Submission (Regulation 19) plan and policies map for consultation (decision dated 22 July 2026, effective 31 July 2026; the Joint Cabinet met on 21 July 2026); Proposed Submission consultation from 9:00am on 3 August 2026 to 5:00pm on 25 September 2026, on soundness only. Next: officers are reviewing comments; "we are required to do this by the end of December 2026" (submission); examination "expected to commence in Spring 2027". The Local Development Scheme (approved and in effect from 21 July 2026) says the plan will replace "the existing local plans for Cambridge and South Cambridgeshire and all adopted Area Action Plans". It plans for "over 50,000 new homes between 2024 and 2045" (council news, 8 July 2026). The North East Cambridge Area Action Plan is not being taken forward separately: it is "included within the Draft Cambridge Local Plan (2025) rather than taking forwards a separate Area Action Plan" (https://greatercambridgeplanning.org/local-and-neighbourhood-planning/area-action-plans/north-east-cambridge-area-action-plan-aap); its earlier stages were Issues and Options 1 (8 December 2014 to 2 February 2015), Issues and Options 2 (11 February to 25 March 2019), the Draft AAP (27 July to 5 October 2020) and a Proposed Submission AAP approved by the councils in January 2022 but never consulted on. The LDS of November 2025 (in effect from 25 November 2025) records the councils' decision on "a consolidated local plan incorporating key policies from the proposed Area Action Plan for North East Cambridge" (p. 5, para 13).

  • Cambridgeshire and Peterborough Minerals and Waste Local Plan Review

    Scoping. Notice of intention to commence published on 3 August 2026; Regulation 45 scoping consultation, with a call for sites, "from Monday 3 August 2026 to Monday 12 October 2026" (closed). The joint timetable then gives the self-assessment summary on or after 1 March 2027, content and evidence consultation on or after 1 October 2027, gateway 2 on or after 1 March 2028, the proposed plan consultation on or after 1 September 2028, gateway 3 on or after 1 January 2029 and submission on or after 1 February 2029. (Copied from the county note.)

Free with any account

Cambridge’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 2 Article 4 directions, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • How the plan draws its settlements

Checking a property in Cambridge?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Cambridge’s own published plans and pages on 29 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.