GoPlanner

Councils

Cheltenham Borough Council local plan

The plans Cheltenham Borough Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Cheltenham, Gloucester and Tewkesbury Strategic and Local Plan (SLP), replacing the Joint Core Strategy, the Cheltenham Plan and the saved 2006 retail policies

    Regulation 18 (evidence gathering, plan preparation and engagement), with the Pre-Submission (Regulation 19) stage postponed. The SLP's timetable page, updated on 21 October 2026, says: 'The Council meetings for the Pre-Submission SLP (Regulation 19) have been postponed. Revised dates will be published in due course.' Completed steps: Regulation 18 consultation on Spatial Options and Key Policy Areas, Tuesday 16 January to Tuesday 13 March 2024, with consultation on the draft site assessment methodology (HELAA) to 12 March 2024. A second phase of engagement on topic and evidence papers began on Monday 20 October 2025 and was to run until June 2026. Cheltenham's Local Development Scheme 2026-2029 (published 23 July 2026) had programmed council approvals for the Pre-Submission SLP in October 2026, Regulation 19 consultation from end October/early November to December 2026, and submission in December 2026, with hearings, the Inspector's report and adoption 'TBC'. The councils prepare it under the 2012 Regulations (LDS footnote 3). No plan period has been fixed; the Regulation 18 document (December 2023, para 2.10, p. 10, https://strategiclocalplan.org/wp-content/uploads/2023/12/SLP-Consultation-Document-Reg-18-1.pdf) said the SLP 'would need to plan up to at least 2041'.

  • Gloucestershire Minerals and Waste Local Plan (replacing the Minerals Local Plan, the Waste Core Strategy, the saved Waste Local Plan policies and the Waste Minimisation in Development Projects SPD)

    Early stage, under the Town and Country Planning (Local Planning) (England) Regulations 2026. The county's Emerging Policy page records approval to commence preparation on 10 June 2026, and publication of the notice of intention to commence and of the Minerals and Waste Development Scheme 2026-2029 on 10 September 2026. Its timetable (revised 16 September 2026, https://www.gloucestershire.gov.uk/media/x5kaw3vq/gloucestershire-minerals-and-waste-plan-timetable-revision-16-sep-26.csv) gives a scoping consultation from 30 November 2026 to 15 January 2027, Gateway 1 self-assessment on 31 January 2027, the proposed plan consultation from 30 November 2027 to 15 January 2028, submission on 31 July 2028 and adoption on 28 February 2029.

Free with any account

Cheltenham Borough Council’s figures

  • Five-year housing land supply, measured at 31 March 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 5 zones
  • 1 Article 4 direction, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Cheltenham Borough Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Cheltenham Borough Council’s own published plans and pages on 24 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.