GoPlanner

Councils

Cheshire East local plan

The plans Cheshire East decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • New Cheshire East Local Plan (to 2045, including minerals and waste), to 31 March 2045

    Early preparation under the new plan-making system; the Gateway 1 self-assessment summary was published on 30 October 2026, which starts the 30-month formal period. The council: "We started preparing a new local plan for Cheshire East Borough on 30 October 2026" (https://localplan.cheshireeast.gov.uk/gateway-1-self-assessment-summary). Completed steps (timetable in effect from 12 June 2026, reviewed monthly, https://localplan.cheshireeast.gov.uk/local-plan-timetable): notice of intention to commence plan preparation 12/06/2026; scoping consultation 21/07/2026 to 01/09/2026; Gateway 1 self-assessment summary 30/10/2026. To come: plan content and evidence consultation 05/07/2027 to 16/08/2027; Gateway 2 advice sought 31/01/2028; proposed plan consultation 03/05/2028 to 28/06/2028; Gateway 3 advice sought 25/08/2028; submission for examination 29/09/2028; council considers adopting the plan 30/03/2029. The timetable says the plan will include all required minerals and waste policies and replace the saved policies of the Cheshire Waste Local Plan and the Cheshire Minerals Local Plan; no separate minerals and waste plan is being prepared.

Free with any account

Cheshire East’s figures

  • Five-year housing land supply, measured at 31 March 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 6 zones
  • 5 Article 4 directions, and what each removes
  • 46 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Cheshire East?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Cheshire East’s own published plans and pages on 23 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.