GoPlanner

Councils

Cheshire West and Chester local plan

The plans Cheshire West and Chester decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Cheshire West and Chester Local Plan (new Local Plan, 2028 to 2038), December 2028 to December 2038

    Early preparation under the new plan-making system; scoping consultation completed on 28 September 2026, Gateway 1 self-assessment due 9 November 2026. The council "has decided to move to the Government's new plan-making system for preparing the Local Plan" (https://planningpolicy.cheshirewestandchester.gov.uk/new-local-plan). Completed steps: Issues and Options (Regulation 18) consultation, which "ran from 4 July to 29 August 2025" (https://planningpolicy.cheshirewestandchester.gov.uk/publications/local-plan-issues-and-options-regulation-18); notice of intention to commence Local Plan preparation published 12 June 2026; scoping consultation from 7 September 2026 to 28 September 2026. Timetable (published 12 June 2026, last updated 21 October 2026, https://planningpolicy.cheshirewestandchester.gov.uk/new-local-plan/local-plan-timetable): Gateway 1 self-assessment summary 9 November 2026; proposed content and evidence consultation 7 December 2026 to 22 January 2027; Gateway 2 1 April 2027; proposed Local Plan consultation 1 October 2027 to 1 December 2027; Gateway 3 1 March 2028; submission for examination 1 May 2028; adoption 1 December 2028 (the first of the month stands for dates not yet known). A call for sites runs from 14 October to 6 November 2026.

Free with any account

Cheshire West and Chester’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 2 zones
  • 6 Article 4 directions, and what each removes
  • 32 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Cheshire West and Chester?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Cheshire West and Chester’s own published plans and pages on 31 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.