GoPlanner

Councils

Colchester local plan

The plans Colchester decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Colchester Local Plan (Local Plan Review, Submission Draft), to replace Sections 1 and 2, to 2043

    Regulation 19 publication, closed: the council's consultation page gives the Submission Draft consultation as opening "Friday 28 August 2026" and closing "Tuesday 13 October 2026 at 4pm" (https://www.new.colchester.gov.uk/colchester-local-plan-0/new-local-plan/engagement-and-consultation; document https://colchester.oc2.uk/document/83). Earlier steps (same page): Call for Sites 20 October 2023 to 5 January 2024; Issues and Options engagement in several rounds from October 2023 to July 2024 (vision 8 February to 21 March 2024; placemaking 13 June to 25 July 2024); Regulation 18 Preferred Options consultation "26 November 2025 to 14 January 2026" (https://colchester.oc2.uk/document/81). The Local Development Scheme of June 2026 records that member approval of the Preferred Options in February 2025 was "(Not approved)", then approval in November 2025, and plans "Submission of Reg 19 Plan and summary of comments received to Secretary of State" in "December 2026", examination "Spring 2027" and adoption "Autumn/Winter 2027"; it says the plan "will replace both the Section 1 and Section 2 Local Plan", that the current plan "is now out of date" (the five-year review having fallen due), and that plans under the existing system "must be submitted for examination no later than 31 December 2026". Not yet submitted, as far as found.

  • Replacement Essex Minerals Local Plan 2025 to 2040 (Minerals Local Plan review), 2025 to 2040

    Regulation 18, the latest step found being the second Regulation 18 consultation. Essex County Council's page lists the completed stages: Regulation 18 consultation on proposed amendments to the 2014 plan in March/April 2021; a Call for Sites in February/March 2022; informal engagement on Policy S6 in February/March 2022; a second Call for Sites in September 2022; and a further Regulation 18 public consultation in February and March 2024 (6 February to 9 April 2024, per the existing plan page), re-run from May to July 2024 to include an omitted site. The county's news of 16 May 2024 said an amended plan with a draft list of Preferred Site allocations "will be subject to a further consultation this winter". No later step (Regulation 19, submission, examination) was found on the county's pages.

Free with any account

Colchester’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 11 Article 4 directions, and what each removes
  • 11 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Colchester?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Colchester’s own published plans and pages on 31 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.