Cornwall local plan
The plans Cornwall decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Cornwall Local Plan: Strategic Policies 2010-2030, adopted 22 November 2016, 2010 to 2030
- Cornwall Local Plan (2016) Saved Policies, adopted 22 November 2016
- Cornwall Site Allocations Development Plan Document, adopted 26 November 2019, to 2030
- Climate Emergency Development Plan Document, adopted 21 February 2023, to 2030
- Minerals Safeguarding Development Plan Document, adopted 4 December 2018, to 2030
Emerging plans
- Cornwall Local Plan (Cornwall Local Plan 2050)
Scoping, under the Town and Country Planning (Local Planning) (England) Regulations 2026. Notice of intention to commence preparation dated 30 April 2026 (timetable 'will have effect from 29th April 2026'); the Regulation 20 scoping and engagement consultation runs 'from 5 October 2026 to 16 November 2026' (baseline and draft scope, vision, draft engagement strategy, ISA scoping report), so no step beyond the notice is complete at 23 October 2026. Earlier, informal: 24 community drop-in events between September 2025 and February 2026. Next, in the council's timetable: 'Gateway 1 self-assessment summary made available' 25 January 2027 (the notice says the council 'expects to start the 30-month plan preparation process on 25th January 2027'); consultation on proposed plan content and evidence 10 May to 21 June 2027; Gateway 2 advice sought 13 September 2027; consultation on the proposed local plan 13 March to 24 April 2028; Gateway 3 3 July 2028; submission for examination 11 November 2028; 'Anticipated date for plan adoption 23 June 2029'. It will cover the whole of Cornwall and 'include strategic policies on minerals and waste'.
Free with any account
Cornwall’s figures
- Five-year housing land supply, measured at 31 March 2025
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 11 zones
- 1 Article 4 direction, and what each removes
- 84 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Cornwall?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Cornwall’s own published plans and pages on 23 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
