Dartford local plan

The plans Dartford decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • New Local Plan (revised form, under the new plan-making system)

    Not started. The Local Development Scheme 2026-2028 (December 2025) says: 'Work towards a new form local plan covering Dartford is programmed to start late 2026 contingent on national policy legislation (with a public consultation held in advance of local elections/ reorganisation)', and that 'The Dartford Plan adopted last year is to be retained (a first statutory review is not required until 2029)' (para 3.13, p. 17). Table I (p. 5) gives its key production stages as 'TBC nationally. Required to complete within 30 months' and its area as 'Borough-wide, including Ebbsfleet (once full legislation in place)'. No notice of intention to commence had been found on the council's pages by 15 October 2026, and planning.data.gov.uk holds only a placeholder record with no dated step.

  • Kent Mineral Sites Plan 2026 (replacing the 2020 Mineral Sites Plan), 2024 to 2039

    Pre-submission (Regulation 19) draft. A draft plan was consulted on in 2023 and work paused while the 2024-39 plan was examined; Kent County Council approved the pre-submission plan for publication and submission on 16 July 2026, with submission to the Secretary of State by 31 December 2026, "examination in Spring/Summer 2027" and adoption to follow (County Council report of 16 July 2026, paras 3.3 and 3.34). The Thanet research recorded representations open from 30 July to 5 October 2026 and adoption planned for February 2028.

Free with any account

Dartford’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 3 zones
  • 7 Article 4 directions, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Dartford?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Dartford’s own published plans and pages on 15 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.