GoPlanner

Councils

East Cambridgeshire local plan

The plans East Cambridgeshire decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • East Cambridgeshire new Local Plan

    On hold. Full Council agreed to start a new Local Plan and adopted a Local Development Scheme on 17 October 2024 (LDS: commencement October 2024; call for sites from January 2025; Regulation 18 consultations June to September 2025 and November 2025 to February 2026; Regulation 19 June to September 2026; submission October to December 2026; adoption June to December 2027). At Full Council on 25 February 2025 councillors "unanimously agreed plans to create a new Local Plan for East Cambridgeshire should be put on hold" (press release of 27 February 2025), citing local government reorganisation, the government's new local plan guidance and the land supply. The council's emerging plan page states the pause and gives no timetable. No Regulation 18 consultation has been held. The plan would replace the 2015 plan (as amended 2023) in full.

  • Cambridgeshire and Peterborough Minerals and Waste Local Plan Review

    Scoping. Notice of intention to commence published on 3 August 2026; Regulation 45 scoping consultation, with a call for sites, "from Monday 3 August 2026 to Monday 12 October 2026" (closed). The joint timetable then gives the self-assessment summary on or after 1 March 2027, content and evidence consultation on or after 1 October 2027, gateway 2 on or after 1 March 2028, the proposed plan consultation on or after 1 September 2028, gateway 3 on or after 1 January 2029 and submission on or after 1 February 2029. (Copied from the county note.)

Free with any account

East Cambridgeshire’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 3 zones
  • 3 Article 4 directions, and what each removes
  • 11 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in East Cambridgeshire?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from East Cambridgeshire’s own published plans and pages on 29 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.