GoPlanner

Councils

East Devon District Council local plan

The plans East Devon District Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • East Devon Local Plan 2020-2042, 2020 to 2042

    Regulation 19 (Publication) complete in two stages, not yet submitted for examination. Completed steps: Issues and Options consultation from January 2021; draft Local Plan (Regulation 18) consultation from 7 November 2022 to 15 January 2023; first Regulation 19 consultation on the final draft 'between 13 February and 31 March' 2025 (council news item, https://azure.eastdevon.gov.uk/news-archive/2025/02/last-chance-to-shape-east-devon-s-future-local-plan-ready-to-go-to-government-inspector/), which drew 3,510 comments; second Regulation 19 consultation on a revised plan and Policies Map, agreed by the Strategic Planning Committee to start 'on, or as soon as possible after, the 28th November 2025' (https://democracy.eastdevon.gov.uk/mgAi.aspx?ID=16805): the Statement of Representations Procedure (CSD-009, November 2025, https://azure.eastdevon.gov.uk/media/oozem22k/csd-009-statement-of-representations-procedure.pdf) says 'Consultation starts on 28 November 2025 and representations are to be received by midday on 26 January 2026'. A spring 2026 update to the Strategic Planning Committee (https://democracy.eastdevon.gov.uk/mgAi.aspx?ID=17379) programmed submission for examination for June 2026, the Committee in May 2026 and Full Council in early June 2026. On 5 May 2026 the Committee was told submission would slip, possibly to the end of 2026, for a transport assessment in the west of the district (the proposed new town at Marlcombe) and work on air quality at the Pebblebed Heaths and River Axe nutrient mitigation (reported by Devon Air Radio, 6 May 2026, https://www.devonairradio.com/news/local-news/plan-for-thousands-of-homes-suffers-delay-to-tackle-vital-gaps/; minutes at https://democracy.eastdevon.gov.uk/documents/s31252/Minutes%2005052026%20Strategic%20Planning%20Committee.pdf, not read). No submission had been found by 25 October 2026. The plan aims for at least 21,000 homes to 2042 and introduces 'Settlement Boundaries' in place of Built-up Area Boundaries.

Free with any account

East Devon District Council’s figures

  • Five-year housing land supply, measured at 31 March 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 6 zones
  • 1 Article 4 direction, and what each removes
  • 28 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in East Devon District Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from East Devon District Council’s own published plans and pages on 25 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.