GoPlanner

Councils

East Hampshire local plan

The plans East Hampshire decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • East Hampshire Local Plan (replacement plan; the Local Plan 2021-2040 under the legacy system was discontinued)

    Restarting under the new plan-making system, with no formal step taken under it. The legacy East Hampshire Local Plan 2021-2040 reached four Regulation 18 consultations: Draft Local Plan, 5 February to 19 March 2019; Large Development Sites, 3 September to 15 October 2019; Issues and Priorities (Part 1), 21 November 2022 to 16 January 2023; Draft Local Plan 2021-2040, 22 January to 8 March 2024 (https://www.easthants.gov.uk/planning-services/planning-policy/local-plan/emerging-local-plan/evidence-base/responses-local-plan). The Local Development Scheme of March 2025 scheduled Regulation 19 for July 2026, which never took place. On 28 May 2026 Cabinet 'Approved the realignment of Local Plan activity, transitioning from progression of a local planning authority-based East Hampshire Local Plan under the legacy planning system to engaging with the new planning system and preparation for future unitary-wide plan-making' (decision effective from 4 June 2026: https://easthants.moderngov.co.uk/ieDecisionDetails.aspx?AIId=21058); the council said it 'will no longer seek to submit a local plan by the end of December 2026'. On 11 September 2026 it said it would be 'starting again and embarking on a 30-month process at least to prepare a new Local Plan', alongside a Supplementary Plan on design, carbon reduction, water use and green streets (https://www.easthants.gov.uk/news/2026/ehdc-will-not-stand-still-while-government-goes-round-circles). A report proposing the restart under the new system is reported to go to Cabinet on 12 November 2026 (see doubts). No notice of intention to commence or timetable under the 2026 regulations was found.

Free with any account

East Hampshire’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 6 zones
  • 1 Article 4 direction, and what each removes
  • 15 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in East Hampshire?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from East Hampshire’s own published plans and pages on 12 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.