East Riding of Yorkshire local plan
The plans East Riding of Yorkshire decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- East Riding Local Plan Update 2020-2039: Strategy Document Update, adopted 2 April 2025, 2020 to 2039
- East Riding Local Plan Update 2020-2039: Allocations Document Update, adopted 2 April 2025, 2020 to 2039
- Joint Minerals Local Plan (East Riding of Yorkshire and Kingston upon Hull), adopted 21 November 2019, to 2033
- Joint Waste Local Plan (Hull and East Riding), adopted November 2004
Emerging plans
- East Riding Local Plan, to 2045
Early preparation under the new plan-making system. Notice of intention to commence published 29 June 2026, giving 30 October 2026 as the start of preparation (https://www.eastriding.gov.uk/download/notice-of-intention-to-commence-plan-making/); scoping consultation Monday 20 July to Monday 31 August 2026 (council bulletin of 30 June 2026, https://content.govdelivery.com/accounts/UKERYC/bulletins/41c3cfa, and the council's Emerging Local Plan page); call for sites open, with nearly 1,000 submissions; Gateway 1 self-assessment summary published 30 October 2026 (https://www.eastriding.gov.uk/download/gateway-1-self-assessment-summary/). Next (timetable, https://www.eastriding.gov.uk/download/local-plan-2045-timetable/): environmental assessment scoping consultation 18 January to 1 March 2027; consultation on proposed plan content and evidence 7 June to 19 July 2027; Gateway 2 advice sought 1 November 2027; proposed plan consultation 28 February to 24 April 2028; Gateway 3 advice sought 14 August 2028; submission for examination 2 October 2028; adoption 30 April 2029.
Free with any account
East Riding of Yorkshire’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 2 Article 4 directions, and what each removes
- 6 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in East Riding of Yorkshire?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from East Riding of Yorkshire’s own published plans and pages on 28 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.