Epsom and Ewell Borough Council local plan
The plans Epsom and Ewell Borough Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Epsom and Ewell Core Strategy, adopted 24 July 2007, 2007 to 2022
- Plan E: An Area Action Plan for Epsom Town Centre, adopted April 2011, to 2026
- Epsom and Ewell Development Management Policies Document, adopted September 2015
- Surrey Minerals Plan 2011: Core Strategy Development Plan Document, adopted 19 July 2011, to 2026
- Surrey Minerals Plan 2011: Primary Aggregates Development Plan Document, adopted 19 July 2011, to 2026
- Surrey Aggregates Recycling Joint Development Plan Document for the Minerals and Waste Plans, adopted 12 February 2013, to 2026
- Surrey Waste Local Plan 2019-2033, adopted 8 December 2020, 2019 to 2033
Emerging plans
- Epsom and Ewell Local Plan 2022-2040, 2022 to 2040
At examination, main modifications out to consultation. Latest step: the council's Local Plan page says 'The Local Plan is now at an advanced stage of examination, with a consultation on the Inspector’s proposed Main Modifications taking place between Monday 2 November and Monday 14 December 2026' (https://www.epsom-ewell.gov.uk/local-plan). Before that, on 15 October 2026 the Programme Officer reported that 'The Inspector has finalised the proposed Main Modifications schedule ready for public consultation', the consultation to be publicised once it starts (https://www.epsom-ewell.gov.uk/localplanexamination). Earlier steps: Regulation 18 draft consultation 1 February to 19 March 2023; Regulation 19 publication 20 December 2024 to 5 February 2025; submitted to the Secretary of State on 10 March 2025; Inspector (C. Masters MA (Hons) FRTPI) appointed 1 April 2025; Stage 1 hearing (legal compliance and duty to cooperate) 28 August 2025; letter to proceed to Stage 2 on 9 September 2025; Stage 2 hearings 30 September to 9 October 2025; post-hearing letters from 22 October 2025 to 29 April 2026, on additional sites that could be allocated through main modifications; focused consultation on those documents 11 May to 15 June 2026; an additional hearing on the additional Green Belt sites on 2 July 2026 (https://www.epsom-ewell.gov.uk/localplanexamination; https://www.epsom-ewell.gov.uk/local-plan). Examined against the December 2023 Framework (the examination page). Adoption has not taken place.
Free with any account
Epsom and Ewell Borough Council’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes
- 6 Article 4 directions, and what each removes
- 1 neighbourhood plan, with the dates they were made
- How the plan draws its settlements
Checking a property in Epsom and Ewell Borough Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Epsom and Ewell Borough Council’s own published plans and pages on 20 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.