GoPlanner

Councils

Exeter City Council local plan

The plans Exeter City Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • The Exeter Plan 2021-2042 (replacing the Core Strategy and the Local Plan First Review), 2021 to 2042

    At examination, by two Inspectors; not adopted as at 25 October 2026 so far as could be found. Completed steps (planning.data.gov.uk's timetable for exeter-local-plan-2021-2042, confirmed where noted): scoping (Issues) consultation 20 September to 17 November 2021; Outline Draft consultation 26 September to 19 December 2022; Full Draft consultation 23 October 2023 to 15 January 2024; Regulation 19 Publication Plan approved by the Executive on 3 December 2024 with an eight-week publication period from 12 December 2024 (https://committees.exeter.gov.uk/ieDecisionDetails.aspx?Id=2533), consultation to 6 February 2025; submitted to the Planning Inspectorate on 26 September 2025 (https://www.planning.data.gov.uk/entity/4221129.json). Hearings were held in March and May 2026 (platform note; Exeter Civic Society records a hearing on 11 March 2026 and further sessions on 12 May (Red Cow and South Gate strategic sites) and 14 May (viability)). On 3 February 2026 the Executive, and on 3 March 2026 Council, were to approve a process for officers, with the Portfolio Holder for City Development, to authorise proposed changes arising from the examination, 'A further report will be taken to Executive following the Examination hearings' (forward plan February 2026, https://committees.exeter.gov.uk/documents/l336/Printed+plan+February+2026.pdf?T=4; issue https://committees.exeter.gov.uk/mgIssueHistoryHome.aspx?IId=58954). No main modifications consultation, Inspectors' report or adoption was found. planning.data.gov.uk's timetable gives adoption as 2027-03-31, which reads as a projected date.

Free with any account

Exeter City Council’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 5 zones
  • 8 Article 4 directions, and what each removes
  • 1 neighbourhood plan, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Exeter City Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Exeter City Council’s own published plans and pages on 25 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.