Folkestone and Hythe local plan
The plans Folkestone and Hythe decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Core Strategy Review 2022, adopted 30 March 2022, 2019/20 to 2036/37
- Places and Policies Local Plan, adopted 16 September 2020, 2006 to 2031
- Kent Minerals and Waste Local Plan 2024-39, adopted 13 March 2025, 2024 to 2039
- Kent Mineral Sites Plan, adopted September 2020, 2019 to 2030
Emerging plans
- Folkestone & Hythe Local Plan (to 2045, under the 2026 plan-making system), 2026 to 2045
Scoping. Notice of intention to commence local plan preparation made available on 30 June 2026 under Regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations 2026 (https://www.folkestone-hythe.gov.uk/planning-policy/notice-intention-commence-local-plan-preparation). The scoping consultation opened on 7 September 2026 (news release 'Published: 7 September 2026': 'open for six weeks ... provide comments by 4pm on Friday 16 October 2026', https://www.folkestone-hythe.gov.uk/news/article/448/new-local-plan-being-worked-on-for-district; the timetable CSV gives an actual start of 07/09/2026 against an estimated 14/09/2026). It is open at 15 October 2026. Gateway 1 (self-assessment) is not yet passed: estimated 30/10/2026. The timetable (published 30 June 2026; CSV entry date 08/09/2026) then estimates consultation on plan content and evidence 13 September to 24 October 2027, Gateway 2 advice sought 29 February 2028 and published 31 March 2028, proposed plan consultation 1 May to 25 June 2028, Gateway 3 advice sought 11 September 2028 and published 9 October 2028, submission 30 October 2028 and adoption 30 April 2029 (https://www.folkestone-hythe.gov.uk/planning-policy/local-plan-timetable; https://www.folkestone-hythe.gov.uk/downloads/file/6752/local-plan-timetable-sept-26). It will replace both the Core Strategy Review and the Places and Policies Local Plan, and covers the whole district (Local Plan Timetable, May 2026, p. 4). It replaces the previous timetable adopted in February 2025.
- Kent Mineral Sites Plan 2026 (replacing the 2020 Mineral Sites Plan), 2024 to 2039
Pre-submission (Regulation 19) draft. A draft plan was consulted on in 2023 and work paused while the 2024-39 plan was examined; Kent County Council approved the pre-submission plan for publication and submission on 16 July 2026, with submission to the Secretary of State by 31 December 2026, "examination in Spring/Summer 2027" and adoption to follow (County Council report of 16 July 2026, paras 3.3 and 3.34). The Thanet research recorded representations open from 30 July to 5 October 2026 and adoption planned for February 2028.
Free with any account
Folkestone and Hythe’s figures
- Five-year housing land supply, measured at 1 April 2024
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 5 zones
- 4 Article 4 directions, and what each removes
- 7 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Folkestone and Hythe?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Folkestone and Hythe’s own published plans and pages on 15 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
