GoPlanner

Councils

Gateshead local plan

The plans Gateshead decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • NewcastleGateshead Local Plan (NGLP), to 2045

    Early preparation under the new plan-making system. Notice of intention to commence local plan preparation given 30 June 2026; scoping consultation 1 July to 29 July 2026; Gateway 1 self-assessment summary timetabled for 31 October 2026 (publication not confirmed). Next: consultation on proposed local plan content and evidence 24 February to 7 April 2027; Gateway 2 27 October 2027; consultation on the proposed local plan 26 January to 22 March 2028; Gateway 3 30 August 2028; submission 27 September 2028; adoption 28 March 2029 (NGLP Timetable, https://www.newcastle.gov.uk/sites/default/files/2026-06/NewcastleGateshead%20Local%20Plan%20Timetable.pdf). Scoping document: https://www.newcastle.gov.uk/sites/default/files/2026-06/NewcastleGateshead%20Local%20Plan%20-%20Scoping%20Consultation%20July%202026.pdf.

Free with any account

Gateshead’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 3 zones
  • 5 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Gateshead?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Gateshead’s own published plans and pages on 27 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.