Gedling local plan

The plans Gedling decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Gedling Local Development Plan, 2025 to 2043

    Publication Draft (Regulation 19) consultation closed; submission for examination expected by the end of December 2026. Gedling withdrew from the Greater Nottingham Strategic Plan: Cabinet recommended it on 13 February 2025 (https://democracy.gedling.gov.uk/documents/s41200/Cabinet+report+-+NPPF+GLP+LDS.pdf) and "the decision was approved by Council on 5th March 2025" (Council report of 10 June 2026, https://democracy.gedling.gov.uk/documents/s45010/Council%20Report.pdf). Completed steps (emerging local plan page, https://www.gedling.gov.uk/planning-and-building-control/planning/planning-policy/emerging-local-plan): Issues and Options consultation, with the Sustainability Appraisal Scoping Report, "between 21st July and 1st September 2025"; Publication Draft approved for consultation by Cabinet on 21 May 2026 (https://democracy.gedling.gov.uk/documents/s44807/Cabinet%20Report%20-%20GLDP%20and%20LDS.pdf) and Council on 10 June 2026, with Council approving submission "subject to there not being the need for any substantial changes following consultation"; Publication Draft consultation "between 22nd June and 3rd August 2026" ("The consultation is now closed"). Planned (same page; Local Development Scheme May 2026, https://www.gedling.gov.uk/sites/default/files/2026-05/Appendix%203%20-%20LDS%202026.pdf): submission "by the end of December 2026"; examination hearings January 2027 ("Independent Examination 2027" on the page); Inspector's report December 2027; adoption "spring 2028". Once adopted it "will replace both the Local Planning Document and the Aligned Core Strategy". Its policies are numbered GLDP 1 onwards (GLDP 12 Spatial Strategy, GLDP 13 Housing Target and Distribution: "A minimum of 11,484 new homes (2025 to 2043)"; GLDP 14 The Green Belt), with Green Belt releases for allocations at the edge of the main built up area, Hucknall, Bestwood Village, Calverton and Ravenshead (Part B). Publication Draft Part A: https://www.gedling.gov.uk/sites/default/files/2026-06/Publication%20Draft%20GLDP%20-%20Part%20A_19_1A_new.pdf; Part B: https://www.gedling.gov.uk/sites/default/files/2026-06/Publication%20Draft%20GLDP%20-%20Part%20B%20Site%20Allocations_19_1B_new.pdf; Policies Map: https://experience.arcgis.com/experience/3d6c95e66ab44068a3a08cb9cf47fd23.

  • Nottinghamshire Minerals Local Plan 2045, to 2045

    Early preparation under the Town and Country Planning (Local Planning) (England) Regulations 2026, jointly by Nottinghamshire County Council and Nottingham City Council, to cover "the administrative areas of Nottinghamshire County Council (ONS code E10000024) and Nottingham City Council (ONS code E60000075)" and continue to do so after local government reorganisation in April 2028 (notice, https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/notice-of-intention-to-commence-preparation). Completed steps: notice of intention to commence plan preparation and timetable published 31 July 2026; scoping consultation from 12 October to 5pm on Monday 9 November 2026 (closed the day before this research; https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/new-minerals-local-plan). Planned (timetable, https://www.nottinghamshire.gov.uk/planning-and-environment/minerals-local-plan/local-plan-timetable; "all dates are subject to change"): call for sites early 2027; Gateway 1 self-assessment 16 April 2027 (when "the councils expect to begin the 30-month plan preparation process"); content and evidence consultation 19 November 2027 to 14 January 2028; Gateway 2 28 April 2028; proposed plan consultation 11 September to 13 November 2028; Gateway 3 26 January 2029; submission 16 March 2029; adoption 20 September 2029. No draft policies yet; the adopted Minerals Local Plan (2021) "will remain in force" until then.

Free with any account

Gedling’s figures

  • Five-year housing land supply, measured at 31 March 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 3 zones
  • 1 Article 4 direction, and what each removes
  • 4 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Gedling?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Gedling’s own published plans and pages on 11 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.