Gloucester City Council local plan
The plans Gloucester City Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Gloucester, Cheltenham and Tewkesbury Joint Core Strategy 2011-2031, adopted 11 December 2017, 2011 to 2031
- Gloucester City Plan 2011-2031, adopted 26 January 2023, 2011 to 2031
- City of Gloucester Local Plan (1983) (saved retail policies), adopted 14 September 1983
- Minerals Local Plan for Gloucestershire, adopted 20 March 2020, 2018 to 2032
- Gloucestershire Waste Core Strategy, adopted 21 November 2012, 2012 to 2027
- Gloucestershire Waste Local Plan 2002-2012 (saved policies), adopted October 2004, 2002 to 2012
Emerging plans
- Cheltenham, Gloucester and Tewkesbury Strategic and Local Plan (SLP), replacing the Joint Core Strategy, the Gloucester City Plan and the saved 1983 policies
Regulation 18 (evidence gathering, plan preparation and engagement), with the Pre-Submission (Regulation 19) stage postponed. The SLP's timetable page (https://strategiclocalplan.org/strategic-and-local-plan-timetable/, read on 25 October 2026) says: 'Please note: The Council meetings for the Pre-Submission SLP (Regulation 19) have been postponed. Revised dates will be published in due course.' Gloucester's Local Development Scheme 2026-2029 ('Adopted 15 July 2026', https://www.gloucester.gov.uk/media/xlfjdahm/local-development-scheme.pdf; the council's LDS page calls it 'updated August 2026') programmes: Regulation 18 evidence gathering, plan preparation and engagement 'February 2025 – September 2026'; council approvals for the Pre-Submission SLP 'October 2026'; Regulation 19 consultation 'End of October/Early November – December 2026'; submission 'December 2026'; hearings, the Inspector's report and adoption 'TBC'. It is prepared under the 2012 Regulations (LDS footnote 3). Completed steps (from the SLP site, as recorded for Cheltenham): Regulation 18 consultation on Spatial Options and Key Policy Areas, 16 January to 13 March 2024, and a second phase of engagement on topic and evidence papers from 20 October 2025. No plan period has been fixed; the Regulation 18 document (December 2023, para 2.10, https://strategiclocalplan.org/wp-content/uploads/2023/12/SLP-Consultation-Document-Reg-18-1.pdf) said the SLP 'would need to plan up to at least 2041'. Gloucester's SLP page (https://www.gloucester.gov.uk/planning-development/planning-policy/strategic-and-local-plan/): 'Once adopted the SLP will replace the Gloucester City Plan 2021-2031 and the Joint Core Strategy 2011-2031.'
- Gloucestershire Minerals and Waste Local Plan (replacing the Minerals Local Plan, the Waste Core Strategy, the saved Waste Local Plan policies and the Waste Minimisation in Development Projects SPD)
Early stage, under the Town and Country Planning (Local Planning) (England) Regulations 2026. The county's Emerging Policy page records approval to commence preparation on 10 June 2026, and publication of the notice of intention to commence and of the Minerals and Waste Development Scheme 2026-2029 on 10 September 2026. Its timetable (revised 16 September 2026, https://www.gloucestershire.gov.uk/media/x5kaw3vq/gloucestershire-minerals-and-waste-plan-timetable-revision-16-sep-26.csv) gives a scoping consultation from 30 November 2026 to 15 January 2027, Gateway 1 self-assessment on 31 January 2027, the proposed plan consultation from 30 November 2027 to 15 January 2028, submission on 31 July 2028 and adoption on 28 February 2029.
Free with any account
Gloucester City Council’s figures
- Five-year housing land supply, measured at 31 March 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 4 zones
- 3 Article 4 directions, and what each removes
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Gloucester City Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Gloucester City Council’s own published plans and pages on 25 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
