Gravesham local plan
The plans Gravesham decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Gravesham Local Plan Core Strategy (with the Local Plan Policies Map 2014), adopted 30 September 2014, 2011 to 2028
- Gravesham Local Plan First Review (saved policies), adopted November 1994
- Kent Minerals and Waste Local Plan 2024-39, adopted 13 March 2025, 2024 to 2039
- Kent Mineral Sites Plan, adopted September 2020, 2019 to 2030
Emerging plans
- Gravesham Local Plan 2042, to 2042
Regulation 19 (Proposed Submission), not yet submitted. Regulation 18 Stage 1 (Issues and Options) ran 25 April to 11 July 2018 and Stage 2 (Preferred Approach) October to December 2020 (Local Development Scheme 2025-2026, March 2025, section 5, https://www.gravesham.gov.uk/downloads/file/910/local-development-scheme). The council's news release of Friday 17 April 2026 says 'Final stage of Local Plan consultation has launched', closing Friday 29 May (https://www.gravesham.gov.uk/news/article/267/final-stage-of-local-plan-consultation-has-launched). Statutory notices then re-ran the Regulation 19 consultation: 29 May 2026 to 31 July 2026 (notice of 11 June 2026, https://publicnoticeportal.uk/notice/planning/6a282af9910cdb872f3ee356) and, by a 'Notice of Revision to the Regulation 19 Public Consultation Dates', 00:00 Monday 6 July 2026 to 17:00 Tuesday 18 August 2026 (published 20 July 2026, https://publicnoticeportal.uk/notice/other/6a5e501c65b1b375e55ec163). The council's plan page still describes the 'Proposed Submission stage, known as the Regulation 19 consultation', with no submission date (https://www.gravesham.gov.uk/localplan-2042). The LDS had programmed submission for December 2025 and adoption for December 2026; that timetable has slipped.
- Kent Mineral Sites Plan 2026 (replacing the 2020 Mineral Sites Plan), 2024 to 2039
Pre-submission (Regulation 19) draft. A draft plan was consulted on in 2023 and work paused while the 2024-39 plan was examined; Kent County Council approved the pre-submission plan for publication and submission on 16 July 2026, with submission to the Secretary of State by 31 December 2026, "examination in Spring/Summer 2027" and adoption to follow (County Council report of 16 July 2026, paras 3.3 and 3.34). The Thanet research recorded representations open from 30 July to 5 October 2026 and adoption planned for February 2028.
Free with any account
Gravesham’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 2 Article 4 directions, and what each removes
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Gravesham?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Gravesham’s own published plans and pages on 16 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
