GoPlanner

Councils

Great Yarmouth local plan

The plans Great Yarmouth decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Great Yarmouth Local Plan (Next Local Plan 2026-2045), 2026 to 2045

    Started under the 2026 plan-making system. The Notice of Intention to Commence Local Plan Preparation "was published on 30 June 2026"; "Provisionally, the plan period is proposed to be 2026 to 2045", to be confirmed after the scoping consultation, and "The Council expects to pass through Gateway 1 and commence the 30 month plan preparation process by 31 October 2026" (https://localplan.great-yarmouth.gov.uk/article/16948/Notice-of-Intention-June-2026). The council's timetable (https://localplan.great-yarmouth.gov.uk/article/16950/Local-Plan-Timetable) schedules a scoping consultation and call for sites from 17 August 2026 (representations by 27 September 2026), Gateway 1 self-assessment on 30 October 2026, content and evidence consultation from 1 April 2027, Gateway 2 in September to October 2027, the proposed plan consultation from 1 April 2028, Gateway 3 in September to October 2028, submission on 1 October 2028, examination to 1 March 2029 and adoption on 1 April 2029 (first-of-month dates where the exact day is not yet known). The only completed step confirmed is the notice of 30 June 2026; whether the scoping consultation ran and Gateway 1 was passed was not confirmed. No draft plan or policies yet.

Free with any account

Great Yarmouth’s figures

  • Five-year housing land supply, measured at 1 April 2024
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 3 Article 4 directions, and what each removes
  • 9 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Great Yarmouth?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Great Yarmouth’s own published plans and pages on 4 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.