Guildford Borough Council local plan

The plans Guildford Borough Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Guildford Local Plan (new-style)

    Scoping consultation held, under the 2026 plan-making system. Latest completed step: the scoping consultation ran 'from 2 September to 15 October 2026' (the page gave 14 October before 24 November 2026) (https://www.guildford.gov.uk/newguildfordlocalplan). Earlier: the timetable was agreed by the Executive on 28 May 2026 and the notice of intention to commence plan preparation was published on 5 June 2026; early engagement workshops were held in January and February 2026. Whether the Gateway 1 self-assessment summary due on 30 October 2026 was published isn't stated: the page's sentence expecting it on that day was removed by 24 November 2026 and nothing was added in its place. Next, per the timetable (https://www.guildford.gov.uk/localplantimetable): Gateway 1 self-assessment on 30 October 2026, which 'marks formal commencement of plan-making'; proposed plan content and evidence consultation 7 April to 19 May 2027; Gateway 2 on 1 September 2027; proposed local plan consultation 1 March to 26 April 2028; Gateway 3 on 25 August 2028; examination from 29 September 2028; adoption 30 April 2029. No draft policies have been published. Until it is adopted the 2019, 2023 and residual 2003 plans remain the development plan.

Free with any account

Guildford Borough Council’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 3 Article 4 directions, and what each removes
  • 9 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Guildford Borough Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Guildford Borough Council’s own published plans and pages on 20 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.