Harborough local plan
The plans Harborough decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Harborough Local Plan 2011-2031, adopted 30 April 2019, 2011 to 2031
- Leicestershire Minerals and Waste Local Plan Up to 2031, adopted 25 September 2019, to 2031
Emerging plans
- Harborough Local Plan 2020 to 2041, 2020 to 2041
At examination, as at 10 November 2026; Stage 2 hearings begin today. Completed steps: Issues and Options (Regulation 18) consultation 16 January to 27 February 2024; Proposed Submission Draft (Regulation 19) consultation 10 March to 6 May 2025 (https://harborough.gov.uk/new-local-plan); approved at an Extraordinary Council meeting on 16 March 2026; submitted to the Secretary of State on 17 April 2026, with a Schedule of Proposed Modifications (May 2026, https://www.harborough.gov.uk/downloads/file/9425/schedule_of_proposed_modifications_to_the_submission_of_the_harborough_local_plan_2020-2041_and_policies_map_may_2026); Inspectors "R Barrett MRTPI IHBC, L Nurser BA (Hons) MA DipUP MRTPI and W Cooper BA (Hons) CMLI" appointed 5 May 2026 (https://www.harborough.gov.uk/info/20082/local_plan_examination/623/examination_overview); Panel Note 1, 15 May 2026, to Panel Note 6, 22 July 2026; Stage 1 hearing on Wednesday 12 August 2026, on whether the Plan should be examined against the December 2023 NPPF under the transitional arrangements in paragraph 234(a) of the 2024 NPPF; the Inspectors' "ID8 - Panel Note 7 - Transitional Arrangements Post Hearing Letter", 19 August 2026 (not read); Stage 2 hearings "will commence at 10am on Tuesday 10th November 2026" at The Symington Building, Market Harborough (https://www.harborough.gov.uk/info/20004/planning_strategy/643/hearing_sessions), with sessions in the weeks starting 9 November, 23 November and 30 November 2026 (https://www.harborough.gov.uk/news/article/1961/examination_of_proposed_local_plan_to_begin_this_week); latest timetable "ID11V4", 4 November 2026 (https://www.harborough.gov.uk/info/20082/local_plan_examination/630/examination_latest_news). Next: main modifications consultation if needed, the Inspectors' report, adoption; no adoption date is given on the council's pages. Its policies are numbered DS01 to DS05, SA01 to SA04, HN01 to HN06, AP01 to AP04 and by topic, none sharing a code with the August 2026 Framework's S3 to S5.
- Joint Leicester, Leicestershire and Rutland Minerals and Waste Local Plan
Proposed, not started. Leicestershire County Council's Cabinet on 28 April 2026 was asked to approve "in principle for the County Council to participate with Leicester City Council and Rutland County Council" in a joint plan, conditional on each authority's formal approval and agreed governance and cost-sharing (https://democracy.leics.gov.uk/documents/s195801/FINAL%20Joint%20MWLP%20Cabinet%20280426%20Clean%20Version.pdf); a further report on the timetable, the Intention to Commence and governance was to follow in autumn 2026. Under the 2026 plan-making system: "The County Council must publish its Intention to Commence a new M&WLP before 31 December 2026" and "a Gateway 1 self-assessment by 30 April 2027"; adoption "would be due to take place in Autumn 2029". "Pending adoption of a replacement plan, the existing adopted Leicestershire M&WLP remains in force." Leicester City's lead councillor report (decision due 24 July 2026, https://cabinet.leicester.gov.uk/documents/s173311/Joint%20MWLP%20Lead%20Councillor%20Report_Final.pdf) recommends the same joint working. No notice of intention to commence was found as at 9 November 2026.
Free with any account
Harborough’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 1 Article 4 direction, and what each removes
- 32 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Harborough?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Harborough’s own published plans and pages on 10 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
