Harlow local plan
The plans Harlow decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Harlow Local Development Plan 2011-2033, adopted 10 December 2020, 2011 to 2033
- Essex Minerals Local Plan 2014, adopted July 2014, to 2029
- Essex and Southend-on-Sea Waste Local Plan 2017, adopted 11 July 2017, to 2032
Emerging plans
- New Harlow Local Development Plan
Not yet started: no formal step completed. The council's New Local Plan page says the plan will be prepared under the Town and Country Planning (Local Planning) (England) Regulations 2026, with a four-month scoping stage before the 30-month process and "3 gateway stages". Its Local Plan Timetable (October 2026) gives the Notice of Intention on 18 December 2026, a scoping consultation from 21 December to 29 January, Gateway 1 by 30 April 2027, a Local Plan Content and Evidence consultation 27 September to 8 November 2027, the Local Plan public consultation 3 July to 28 August 2028, submission by 31 January 2029 and adoption by 31 October 2029 (https://www.harlow.gov.uk/sites/default/files/documents/Local%20Plan%20Timetable%20-%20October%202026.pdf). The earlier Local Development Scheme (March 2025) had given notice in January 2026 and adoption in November 2028; that timetable has slipped.
- Replacement Essex Minerals Local Plan 2025 to 2040 (Minerals Local Plan review), 2025 to 2040
Regulation 18, the latest step found being the second Regulation 18 consultation. Essex County Council's page lists the completed stages: Regulation 18 consultation on proposed amendments to the 2014 plan in March/April 2021; a Call for Sites in February/March 2022; informal engagement on Policy S6 in February/March 2022; a second Call for Sites in September 2022; and a further Regulation 18 public consultation in February and March 2024 (6 February to 9 April 2024, per the existing plan page), re-run from May to July 2024 to include an omitted site. The county's news of 16 May 2024 said an amended plan with a draft list of Preferred Site allocations "will be subject to a further consultation this winter". No later step (Regulation 19, submission, examination) was found on the county's pages.
Free with any account
Harlow’s figures
- Five-year housing land supply, measured at 31 March 2026
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 14 Article 4 directions, and what each removes
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Harlow?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Harlow’s own published plans and pages on 31 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
