GoPlanner

Councils

Hart local plan

The plans Hart decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Hart Local Plan 2044 (new Hart Local Plan, under the 2026 plan-making system), 2026 to 2044

    Consultation on proposed plan content and evidence open, 26 October to 7 December 2026 (https://www.hart.gov.uk/planning-and-building-control/planning-policy/local-plan-timetable). Completed steps: notice of intention to commence plan preparation, 29 April 2026 (https://www.hart.gov.uk/planning-and-building-control/planning-policy/notice-intention-commence-new-local-plan); scoping consultation, 27 May to 19 June 2026 (https://www.hart.gov.uk/planning-and-building-control/planning-policy/new-hart-local-plan/local-plan-scoping-consultation); Gateway 1, 23 September 2026, which 'formally marks the start of the 30-month plan preparation period', with a published Gateway 1 Self-Assessment Summary. Next: Gateway 2, 30 June to 30 July 2027; consultation on the proposed plan, 3 September to 29 October 2027; Gateway 3, 3 January to 29 February 2028; submission 31 March 2028; examination 31 March to 31 August 2028; adoption 31 October 2028. The timetable takes effect from 26 October 2026; it was amended on 14 October 2026 to revise the dates of the consultation on proposed plan content and evidence and on 26 October 2026 to add that consultation's links (https://www.hart.gov.uk/planning-and-building-control/planning-policy/local-plan-timetable).

Free with any account

Hart’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 5 Article 4 directions, and what each removes
  • 10 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Hart?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Hart’s own published plans and pages on 13 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.