Hartlepool local plan
The plans Hartlepool decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Hartlepool Local Plan, adopted 22 May 2018, 2016 to 2031
- Tees Valley Joint Minerals and Waste Core Strategy Development Plan Document, adopted 15 September 2011, to 2026
- Tees Valley Joint Minerals and Waste Policies and Sites Development Plan Document, adopted 15 September 2011, to 2026
Emerging plans
- Hartlepool Local Plan (review)
Not started. The Local Development Scheme (dated February 2025 in its text, filed as "Dec 2025", https://www.hartlepool.gov.uk/download/downloads/id/661/hartlepool_local_development_scheme_-_dec_2025.pdf) plans evidence gathering and pre-consultation from 2025 to December 2027, commencement in January 2028, consultation on a draft in October to December 2028, submission in January to April 2029, hearings in July 2029 and adoption in June 2030. It records no completed stage, and planning.data.gov.uk records none.
Free with any account
Hartlepool’s figures
- Five-year housing land supply, measured at 1 April 2024
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 3 Article 4 directions, and what each removes
- 1 neighbourhood plan, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Hartlepool?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Hartlepool’s own published plans and pages on 27 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
