Hastings local plan
The plans Hastings decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Hastings Local Plan: The Hastings Planning Strategy 2011-2028, adopted 19 February 2014, 2011 to 2028
- Hastings Local Plan: Development Management Plan, adopted 23 September 2015
- East Sussex, South Downs and Brighton & Hove Waste and Minerals Plan, adopted 19 February 2013
- East Sussex, South Downs and Brighton & Hove Waste and Minerals Sites Plan, adopted 7 February 2017
- East Sussex, South Downs and Brighton & Hove Waste and Minerals Local Plan: Revised Policies, adopted 24 October 2024, 2019 to 2030
Emerging plans
- Hastings Local Plan 2023-2041 (Pre-Submission Version), 2023 to 2041
After publication (Regulation 19): representations were invited from 1 October 2026 to 11:59pm on 12 November 2026, and that period has closed (https://www.hastings.gov.uk/planning/policy/new-local-plan/draft-new-local-plan-reg-19/); the Pre-Submission version was corrected on 20 October 2026 'to update a missing criterion in policy SP2'. Earlier steps: a first Regulation 18 consultation on a draft plan that 'ended on 24 March 2021' (27 January to 24 March 2021 in the Local Development Scheme); a Regulation 18 Draft Local Plan Preferred Options consultation, approved by Cabinet on 26 January 2026, ending on 7 April 2026 (https://hastings.oc2.uk/document/190); Cabinet on 7 September 2026 recommended publication. The Local Development Scheme (January 2026) programmed submission for December 2026 and adoption for June 2028. Once adopted it replaces the Planning Strategy (2014) and the Development Management Plan (2015).
Free with any account
Hastings’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 6 Article 4 directions, and what each removes
- How the plan draws its settlements
Checking a property in Hastings?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Hastings’s own published plans and pages on 9 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
