GoPlanner

Councils

Horsham local plan

The plans Horsham decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Horsham District Local Plan 2023-2040, 2023 to 2040

    At examination, after the second stage of hearings; the Inspector issued his post-hearing letter (IDJB14) on 30 October 2026. Regulation 19 document approved by Full Council on 11 December 2023; representations 19 January to 1 March 2024; submitted to the Secretary of State on 26 July 2024 (Inspector Luke Fleming appointed 30 July 2024). The Inspector cancelled the December 2024 and January 2025 hearings on 16 December 2024 (ID06), and his Interim Findings letter (ID08) was published on 22 April 2025; a draft Cabinet report recommending withdrawal was published on 21 July 2025 and the item postponed on 29 July 2025, and the plan was not withdrawn. The Planning Inspectorate reassigned the examination to Inspector Jonathan Bore on 28 January 2026 (ID12: https://www.horsham.gov.uk/__data/assets/pdf_file/0008/160289/ID12-Local-Plan-06-Change-Inspector.pdf), who on 11 February 2026 wrote 'I am going to approach the examination afresh' (IDJB01). Stage 1 hearings were held from 21 April 2026; post-hearing letter IDJB05 published 7 May 2026. Consultation on a Schedule of Proposed Main Modifications ran from 13 July 2026 to 24 August 2026 (https://www.horsham.gov.uk/planning/local-plan/main-modifications). On 16 September 2026 the Inspector said the plan is examined under the September 2023 NPPF. Stage 2 hearings (spatial strategy and site allocations) opened on 13 October 2026 and were livestreamed, under hearing agendas revised on 8, 12 and 13 October 2026; at the Inspector's request the council produced a Topic Paper on Water Supply and Water Quality (12 October 2026), and responses on education surplus (IDJB11, 20 October 2026) and Action Point 4 (29 October 2026) followed. The Inspector issued his post-hearing letter, 'IDJB14 Inspector's Post-Hearing Letter - October 2026', on 30 October 2026; what it finds has not been read for this entry. No Inspector's report or adoption yet. It covers the district outside the South Downs National Park and would replace the HDPF.

  • Horsham District 2045, to 2045

    Preparation under the new local plan system. Notice of intention to commence published 25 June 2026; scoping consultation 30 June to 28 July 2026, and a call for sites 30 June to 25 August 2026. The council expects to 'formally start the 30-month plan preparation process on 1 November 2026', with Gateway 1 by 31 October 2026, submission in September 2028 and adoption in March 2029. The timetable gives 1 April 2028 as vesting day for local government reorganisation in Sussex, so adoption 'may need to be undertaken by the new unitary council'.

Free with any account

Horsham’s figures

  • Five-year housing land supply, measured at 1 April 2025
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 2 zones
  • 1 Article 4 direction, and what each removes
  • 25 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in Horsham?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Horsham’s own published plans and pages on 8 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.