King's Lynn and West Norfolk local plan
The plans King's Lynn and West Norfolk decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- King's Lynn and West Norfolk Local Plan 2021-2040, adopted 27 March 2025, 2021 to 2040
- Norfolk Minerals and Waste Local Plan 2023-2038, adopted 20 May 2025, 2023 to 2038
Emerging plans
- King's Lynn and West Norfolk Local Plan 2026-2044, 2026 to 2044
A new single-council plan under the 2026 plan-making system, "replacing the existing adopted King's Lynn and West Norfolk Local Plan (2025)", for the whole borough, not joint (Local Plan Timetable, published October 2026, https://www.west-norfolk.gov.uk/download/downloads/id/9969/next_local_plan_timetable_noi_-_august_2026.pdf). Completed steps: call for sites, extended to 1 May 2026 (council news, 1 April 2026, https://www.west-norfolk.gov.uk/news/article/2033/call_for_sites_to_help_shape_future_development); Notice of Intention to commence and timetable, 15 June 2026 (https://www.west-norfolk.gov.uk/download/downloads/id/9993/notice_of_intention_-_june_2026.pdf); scoping consultation 1 to 29 September 2026, approved by Cabinet on 23 July 2026 (https://www.west-norfolk.gov.uk/info/20254/next_local_plan_2026-2044/1316/local_plan_2026-2044_scoping_consultation); Gateway 1 self-assessment published (timetable: 30 October 2026), which starts the 30-month period (https://www.west-norfolk.gov.uk/info/20254/next_local_plan_2026-2044/1323/local_plan_2026-2044_gateway_1_self-assessment). Timetable as published: summary of scoping findings November 2026; draft plan consultation 17 May to 30 June 2027; Gateway 2 November to December 2027; proposed plan consultation 1 April to 16 May 2028; Gateway 3 September to October 2028; submission 1 November 2028; examination to 16 March 2029; adoption 31 May 2029. The council's Gateway 1 page: the Government's revised calculation "increases local housing need by around 80%". No draft policies yet.
Free with any account
King's Lynn and West Norfolk’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 5 zones
- 11 Article 4 directions, and what each removes
- 28 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in King's Lynn and West Norfolk?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from King's Lynn and West Norfolk’s own published plans and pages on 5 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
