Kingston upon Thames local plan
The plans Kingston upon Thames decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Kingston Core Strategy, adopted 17 April 2012, 2012 to 2027
- Kingston Town Centre Area Action Plan (K+20), adopted July 2008, 2008 to 2020
- South London Waste Plan 2022-2037, adopted 13 December 2022, 2022 to 2037
- The London Plan 2021, adopted 2 March 2021, 2019 to 2041
Emerging plans
- Kingston's Local Plan 2028-2043 (Publication Version), replacing the Core Strategy and the Kingston Town Centre Area Action Plan, 2028 to 2043
Publication (Regulation 19 of the 2012 Regulations), not yet submitted. The Publication Version was consulted on from 6 July to 4 September 2026, and a separate Regulation 19 consultation on its Habitats Regulations Assessment opened on 28 September and closes at 11.59pm on 9 November 2026. The council says it will submit the plan to the Planning Inspectorate in December 2026, and expects the examination in 2027 and, if the plan is found sound, adoption in 2028. Earlier stages, under Regulation 18: Early Engagement (1 May to 31 July 2019), Further Engagement (29 June to 30 September 2021) and the First Draft Local Plan 2019-2041 (28 November 2022 to 28 February 2023); a call for sites ran in March 2026. It is being prepared under the old system, not the 2026 one: the Local Development Scheme (February 2026) says it must be submitted by 31 December 2026 to remain in the current system, and that a review would begin immediately on adoption.
- Draft London Plan, to 2050
Draft published 16 July 2026; consultation closed at 5pm on Thursday, 15 October 2026 (comments on a correction to Table 3.1 accepted until 23 October 2026). The Greater London Authority expects examination in 2027 and adoption in early 2028.
Free with any account
Kingston upon Thames’s figures
- Five-year housing land supply, measured at 1 April 2024
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 7 zones
- 3 Article 4 directions, and what each removes
- 1 neighbourhood plan, with the dates they were made
- How the plan draws its settlements
Checking a property in Kingston upon Thames?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Kingston upon Thames’s own published plans and pages on 6 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
