Luton local plan
The plans Luton decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Luton Local Plan (2011-2031), adopted 7 November 2017, 2011 to 2031
- Minerals and Waste Local Plan: Strategic Sites and Policies, adopted 21 January 2014, to 2028
Emerging plans
- Luton Local Plan, 2025 to 2050
New-system plan, Gateway 1 completed on 22 October 2026, "marking formal commencement of plan making". The notice of intention to commence and the scoping consultation were published on 28 May 2026, with the timetable taking effect the same day; the call for sites and scoping consultation ran from 28 May to 23 July 2026, and the scoping consultation summary was published in October 2026. The monthly review of 28 September 2026 found "No changes". The timetable then gives consultation on proposed content and evidence (with a final call for sites) from 13 May to 24 June 2027, Gateway 2 on 17 August 2027, consultation on the proposed Local Plan from 18 November 2027 to 20 January 2028, Gateway 3 on 17 February 2028, submission on 15 June 2028, examination June to October 2028 and adoption on 22 December 2028. It restarts earlier work: an Issues and Options consultation (community involvement paper, closed 7 February 2025) under the old system, after which the council "procedurally restarted the preparation of the new Local Plan from the beginning" (Gateway 1 summary, section 2.2).
- Bedfordshire Minerals and Waste Plan (joint, to replace the 2014 plan), to 2050
Scoping consultation from 12 October to 27 November 2026, after the notice to commence published on 5 October 2026 (Luton's page; the Bedford entry gives Central Bedfordshire's extended close of 11pm on 27 November 2026). Luton's Full Council agreed to the joint plan on 15 July 2025. Luton's page: "We expect to pass through gateway 1 and begin the 30-month plan preparation process on 31 March 2027."
Free with any account
Luton’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 6 Article 4 directions, and what each removes
- How the plan draws its settlements
Checking a property in Luton?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Luton’s own published plans and pages on 28 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
