GoPlanner

Councils

Maidstone local plan

The plans Maidstone decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Maidstone New Local Plan

    Preparation begun; no formal plan-making step completed and no timetable published. Cabinet 'approved commencing work on preparing a New Local Plan' on 22 October 2025; on 15 April 2026 Cabinet resolved that officers continue preliminary 'get ready' tasks and that a call for sites be held over summer 2026; the Call for Sites opened on 15 June 2026 and 'has now closed' (23 August 2026). 'The Plan Timetable for the New Local Plan will be published in due course.' The Local Plan Review 'remains the adopted development plan for the borough' until a new plan is adopted (council page, read 16 October 2026).

  • Kent Mineral Sites Plan 2026 (replacing the 2020 Mineral Sites Plan), 2024 to 2039

    Pre-submission (Regulation 19) draft. A draft plan was consulted on in 2023 and work paused while the 2024-39 plan was examined; Kent County Council approved the pre-submission plan for publication and submission on 16 July 2026, with submission to the Secretary of State by 31 December 2026, "examination in Spring/Summer 2027" and adoption to follow (County Council report of 16 July 2026, paras 3.3 and 3.34). The Thanet research recorded representations open from 30 July to 5 October 2026 and adoption planned for February 2028.

Free with any account

Maidstone’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 4 zones
  • 7 Article 4 directions, and what each removes
  • 21 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Maidstone?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Maidstone’s own published plans and pages on 16 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.