Maldon local plan
The plans Maldon decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Maldon District Local Development Plan 2014-2029 (Approved LDP), adopted 21 July 2017, 2014 to 2029
- Essex Minerals Local Plan 2014, adopted July 2014, to 2029
- Essex and Southend-on-Sea Waste Local Plan 2017, adopted 11 July 2017, to 2032
Emerging plans
- Maldon District Local Plan (new plan-making system), to replace the Local Development Plan 2014-2029
Commenced: notice of intention to commence published 25 September 2026 (https://www.maldon.gov.uk/info/20045/planning_and_building_control/10267/notice_of_intention_to_commence: "The Maldon District Local Plan will cover the administrative area of Maldon District"; the council "expects to formally begin the preparation ... after it has passed through its self-assessment (Gateway 1) in March 2027"). The timetable published the same day (https://www.maldon.gov.uk/info/20045/planning_and_building_control/10266/the_local_plan_timetable), which replaces the LDS of February 2025, gives: scoping consultation 25/11/2026 to 22/12/2026; Gateway 1 self-assessment published 12/03/2027; proposed plan contents and evidence consultation 27/08/2027 to 07/10/2027; Gateway 2 advice sought 19/11/2027 and published 16/12/2027; proposed Local Plan consultation 26/05/2028 to 19/07/2028; Gateway 3 advice sought 14/09/2028 and published 11/10/2028; submission for examination 24/10/2028; examination recommendations 29/03/2029; adoption 02/05/2029. The council's news of 17 September 2026 (https://www.maldon.gov.uk/news/article/7025/maldon_district_council_prepares_to_begin_work_on_new_local_plan) says Council agreed on 10 September to start, that Maldon is "the first local authority in Essex to be producing a Local Plan under the new 30-month plan-making system", and that the new plan "will replace the Maldon District Local Development Plan 2014–2029". It carries forward the earlier Local Development Plan Review 2021+ (old system), decided on 23 February 2021, whose only completed step was the Regulation 18 Issues and Options consultation, "Winter 2021/22 - Completed" (LDS 2023-2027, https://www.maldon.gov.uk/download/downloads/id/19866/local_development_scheme_-_february_2025.pdf); on 14 September 2023 the council agreed to explore three growth options (https://www.maldon.gov.uk/info/7050/planning_policy/9897/local_development_plan_review_2021). The February 2025 LDS's later dates (Preferred Strategy October to December 2026, Regulation 19 April to June 2027) are superseded. As at 1 November 2026 the scoping consultation has not opened.
- Replacement Essex Minerals Local Plan 2025 to 2040 (Minerals Local Plan review), 2025 to 2040
Regulation 18, the latest step found being the second Regulation 18 consultation. Essex County Council's page lists the completed stages: Regulation 18 consultation on proposed amendments to the 2014 plan in March/April 2021; a Call for Sites in February/March 2022; informal engagement on Policy S6 in February/March 2022; a second Call for Sites in September 2022; and a further Regulation 18 public consultation in February and March 2024 (6 February to 9 April 2024, per the existing plan page), re-run from May to July 2024 to include an omitted site. The county's news of 16 May 2024 said an amended plan with a draft list of Preferred Site allocations "will be subject to a further consultation this winter". No later step (Regulation 19, submission, examination) was found on the county's pages.
Free with any account
Maldon’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 24 Article 4 directions, and what each removes
- 6 neighbourhood plans, with the dates they were made
- What new homes pay towards protected habitat sites
- How the plan draws its settlements
Checking a property in Maldon?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Maldon’s own published plans and pages on 1 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
