Manchester local plan
The plans Manchester decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Places for Everyone Joint Development Plan Document, adopted 21 March 2024, 2022 to 2039
- Manchester Core Strategy Development Plan Document, adopted 11 July 2012, 2012 to 2027
- Manchester Unitary Development Plan (extant policies), adopted July 1995
- Greater Manchester Joint Waste Development Plan Document, adopted 1 April 2012, to 2027
- Greater Manchester Joint Minerals Development Plan Document, adopted 26 April 2013, to 2028
Emerging plans
- Manchester Local Plan (2022 to 2039), 2022 to 2039
Publication (Regulation 19) consultation closed. The Statement of Representations (https://www.manchester.gov.uk/__data/assets/pdf_file/0025/184912/Statement-of-Representations.pdf) invited representations on the 'Manchester Local Plan (Publication Draft)' 'from 00.01 Monday 17 August 2026 to 23.59 Monday 28 September 2026'. The Local Development Scheme (July 2026) schedules submission for '31 December 2026', examination 'Jan to June 2027' and adoption '31 July 2027'; no submission was found. Earlier stages: Issues consultation '7 February 2020 – 1 May 2020'; Draft Local Plan (Regulation 18) '22 September 2025 – 17 November 2025'. The plan reviews the Core Strategy (2012) and saved UDP (1995) policies (Publication Draft para 2.3, p. 9) and sets the period 2022 to 2039 (para 2.4, p. 9). Plan text: https://www.manchester.gov.uk/__data/assets/pdf_file/0024/185118/Manchester-local-Plan-Publication-Draft-Reg-19-Consultation-2026-140826comp.pdf.
- Greater Manchester Joint Minerals and Waste Plan
Not yet formally started. The ten Greater Manchester councils agreed in 2025 to replace the 2012 Waste Plan and the 2013 Minerals Plan with a single joint plan; GMCA says a timetable and formal notice to commence plan-making will be published in due course (from Bolton's, Trafford's and Bury's entries; not re-read for Manchester).
Free with any account
Manchester’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 7 Article 4 directions, and what each removes
- How the plan draws its settlements
Checking a property in Manchester?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Manchester’s own published plans and pages on 24 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
