GoPlanner

Councils

Mid Sussex local plan

The plans Mid Sussex decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Mid Sussex District Plan 2021-2039 (District Plan Review), 2021 to 2039 (2021 to 2040 as proposed to be modified)

    At examination, after main modifications consultation. Regulation 18 consultation 7 November to 19 December 2022; Regulation 19 draft approved by Council on 13 December 2023 and consulted on 12 January to 23 February 2024; submitted 8 July 2024. The first Inspector found that the duty to cooperate had not been met (letter of 1 August 2025, https://www.midsussex.gov.uk/media/w25ardcp/id-013-letter-re-stage-1-findings.pdf), and the council said on 2 June 2025 it would challenge her views; the plan was not withdrawn. On 3 December 2025 the Planning Inspectorate appointed a new Inspector, Jonathan Bore MRTPI (https://www.midsussex.gov.uk/media/a4ap5vvi/pins_msdc_nov25changeofinspector.pdf). Hearings were held in February and March 2026; post-hearing letter IDJB-12 (March 2026); 35 additional sites tested (MS-TP5, 17 July 2026). Main modifications (https://www.midsussex.gov.uk/media/c22b0b4n/dp2a-schedule-of-main-modifications-july-2026.pdf) were consulted on from 27 July to 7 September 2026; they extend the plan period to 2040 and give a requirement of 24,071 homes (local housing need of 19,243 plus 3,753 for Crawley and 1,075 for Brighton and Hove). Resumed hearings on the main modifications and site allocations were held from 3 November 2026 (notice of 22 September 2026; hearing statements published 26 October 2026); the session set for 6 November 2026 on MM65 and MM66 (Colwell Farm, Haywards Heath) was cancelled on 4 November 2026, outline permission for 80 homes on MM66 having been granted on appeal (programme IDJB-17 V4). After the hearings the Inspector asked for a topic paper on selecting sites within the High Weald National Landscape, which the council published as MS-TP6 on 13 November 2026. No further post-hearing letter yet. The council expects adoption at 'end 2026' or winter 2026/27. It will replace the District Plan 2014-2031, outside the South Downs National Park.

Free with any account

Mid Sussex’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 3 Article 4 directions, and what each removes
  • 20 neighbourhood plans, with the dates they were made
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in Mid Sussex?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Mid Sussex’s own published plans and pages on 8 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.