Milton Keynes local plan
The plans Milton Keynes decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Plan:MK 2016-2031, adopted 20 March 2019, 2016 to 2031
- Milton Keynes Site Allocations Plan, adopted 18 July 2018
- Milton Keynes Minerals Local Plan, adopted 1 July 2017, to 31 December 2032
- Milton Keynes Waste Development Plan Document (Core Strategy, Allocations and Development Control Policies), adopted February 2008, 2007 to 2026
Emerging plans
- Milton Keynes City Plan 2050 (to replace Plan:MK), 2022 to 2050
At examination. Regulation 18 consultation 17 July to 9 October 2024. Regulation 19 publication 7 November to 22 December 2025, re-consulted 5 January to 16 February 2026 because some consultees had not been notified. Submitted on 22 April 2026; Inspectors P Mileham and S Hubbard appointed 27 April 2026. Stage 1 hearings began on 15 September 2026 and are programmed to 8 October 2026. No main modifications, Inspectors' report or adoption by 5 October 2026.
- Milton Keynes Minerals and Waste Local Plan (to replace the Minerals Local Plan 2017 and the Waste DPD 2008), to 2050
Starting. A delegated decision of 18 August 2026 approved a Notice of Intention to Commence and a timetable: scoping consultation October to November 2026, Gateway 1 February 2027, proposed plan consultation July to August 2028, submission February 2029, adoption August 2029. No step was confirmed completed by 5 October 2026.
Free with any account
Milton Keynes’s figures
- Five-year housing land supply, measured at 1 April 2024
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 23 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in Milton Keynes?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from Milton Keynes’s own published plans and pages on 5 October 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
