GoPlanner

Councils

North Hertfordshire local plan

The plans North Hertfordshire decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • North Hertfordshire Local Plan (new Local Plan, under the 2026 plan-making system), to 2040

    Plan Content and Evidence consultation, open from 13 October to 24 November 2026 (https://www.north-herts.gov.uk/content-and-evidence-document: "The consultation on the document is open from 13 October to 24 November 2026"). Completed steps: Notice of intention to commence Local Plan preparation published on 24 April 2026 under regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations 2026 (https://www.north-herts.gov.uk/notice-intention); Scoping consultation from 11 May to 28 June 2026, with a Scoping Consultation Summary Report (https://www.north-herts.gov.uk/scoping-stage); Gateway 1 self-assessment published on 9 October 2026, from which the 30-month preparation period runs (https://www.north-herts.gov.uk/sites/default/files/2026-10/Gateway%201%20self-assessment.pdf: "we officially started preparing a new Local Plan for North Herts Council on 9 October 2026 (publication of the Gateway 1 assessment)"). Next, on the council's timetable, which "takes effect from 24 April 2026" and replaces the Local Development Scheme (https://www.north-herts.gov.uk/local-plan-timetable): Gateway 2 advice sought 5 April 2027; Proposed Plan consultation 26 October 2027 to 4 January 2028; Gateway 3 advice sought 27 March 2028; submission 31 May 2028; examination recommendations 30 November 2028; adoption 5 January 2029. The Content and Evidence Document gives a standard-method requirement of "1,036 homes per year, equating to approximately 11,396 homes between 2029 and 2040" (Content and Evidence Document, https://www.north-herts.gov.uk/sites/default/files/2026-10/Content%20and%20Evidence%20Document.pdf). No policies or sites are yet proposed: it carries no weight as policy.

Free with any account

North Hertfordshire’s figures

  • Five-year housing land supply, measured at 31 March 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 6 Article 4 directions, and what each removes
  • 14 neighbourhood plans, with the dates they were made
  • How the plan draws its settlements

Checking a property in North Hertfordshire?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from North Hertfordshire’s own published plans and pages on 3 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.