North Kesteven local plan
The plans North Kesteven decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- Central Lincolnshire Local Plan, adopted 13 April 2023, 2018 to 2040
- Lincolnshire Minerals and Waste Local Plan: Core Strategy and Development Management Policies, adopted 1 June 2016, 2014 to 2031
- Lincolnshire Minerals and Waste Local Plan: Site Locations, adopted 15 December 2017, 2014 to 2031
Emerging plans
- Central Lincolnshire Local Plan (review, 2024 to 2044), 2024 to 2044
Early preparation under the Town and Country Planning (Local Planning) (England) Regulations 2026; the formal 30-month process has not started (Gateway 1 planned for 1 March 2027), and there is no draft plan or policies yet. Completed steps: the CLJSPC "Approved the commencement of work on reviewing the Local Plan" on 13 October 2025 (minutes in the agenda for 6 July 2026, https://cl-assets.public-i.tv/west-lindsey/document/06.07.26_CLJSPC_Agenda325034896b.pdf); a call for sites "between December 2025 and February 2026" (https://www.central-lincs.org.uk/consultations); Notice of Intention to Commence Local Plan Preparation and Local Plan Timetable published 12 October 2026 (https://www.central-lincs.org.uk/sites/default/files/1320973/2026-10/Notice%20of%20Intention%20to%20Commence%20Local%20Plan%20Preparation%20Oct%202026.pdf: "We expect to start the 30-month plan preparation process on 1 March 2027"); Scoping Consultation (Regulation 20) open from 22 October 2026, representations "by no later than 23:59 on Thursday 17 December 2026" (notice, https://www.central-lincs.org.uk/sites/default/files/1320973/2026-11/Central%20Lincolnshire%20Notice%20of%20Local%20Plan%20Scoping%20Consultation_1.pdf; the timetable dataset notes "Consultation extended by additional two weeks"), with the call for sites reopened alongside. The scoping material proposes settlement boundaries in place of the developed footprint (see settlement). Planned (Local Plan Review Timetable, https://www.central-lincs.org.uk/sites/default/files/1320973/2026-11/Local%20Plan%20Review%20Timetable%20web%20version%20Nov%202026.pdf, and its dataset under the Open Government Licence, https://www.central-lincs.org.uk/sites/default/files/1320973/2026-10/central-lincs-plan-timetable.csv; "where precise dates are currently unknown the 1st of the month is set out"): Gateway 1 self-assessment 1 March 2027; proposed plan content and evidence consultation 30 September to 11 November 2027; Gateway 2 1 January 2028; proposed plan consultation 1 June to 1 August 2028; Gateway 3 1 October 2028; submission 1 December 2028; examination 1 January to 1 July 2029; adoption 1 September 2029. The timetable: it "will have a plan period of 1 April 2024 to 31 March 2044, replacing the adopted 2023 Central Lincolnshire Local Plan", and "will not cover Minerals and Waste development".
- Lincolnshire Minerals and Waste Local Plan (update, to 2042), to 2042
Proposed Submission Version (Regulation 19 of the 2012 Regulations) consultation closed on 31 July 2026; not yet submitted as at 12 November 2026. The county's page (https://www.lincolnshire.gov.uk/planning/minerals-waste/2): "The updated Plan will replace both parts of the adopted Plan and cover the period to 2042. ... The Plan has undergone two formal consultation stages under Regulation 18 of the Town and Country Planning (Local Planning) (England) Regulations 2012 (as amended) (2012 Regulations), an Issues and Options consultation in mid 2022 and a Preferred Approach consultation in mid 2024." "Consultation on the Lincolnshire Minerals and Waste Local Plan: Proposed Submission Version, in accordance with Regulation 19 (of the 2012 Regulations), took place between 15 June 2026 and 5pm on 31 July 2026. This was the final chance to comment on the emerging Minerals and Waste Local Plan before it is sent to the Secretary of State for independent examination." Completed steps: the county resolved to update the plan in 2021 (following its review of February 2021, https://www.lincolnshire.gov.uk/downloads/file/5053/review-of-the-lmwlp-19-2-21-accessible-version-); Issues and Options (Regulation 18), "Summer 2022"; Preferred Approach (Regulation 18), "Summer 2024"; Proposed Submission (Regulation 19), 15 June to 31 July 2026. Next (Minerals and Waste Development Scheme, February 2026, https://www.lincolnshire.gov.uk/downloads/file/10749/minerals-and-waste-development-scheme-february-2026): "Submission (Regulation 22)– Final draft of plan submitted to Secretary of State ... December 2026"; "Examination ... Summer/Autumn 2027"; "Adoption – Inspector’s final report and adoption by Full Council – Winter 2027". The new plan "will consolidate the two adopted DPDs into one Local Plan, for a plan period to the end of 2042" (para 4.2). Consultation portal: http://www.letstalk.lincolnshire.gov.uk/mwplan-2026 (not opened).
Free with any account
North Kesteven’s figures
- Five-year housing land supply, measured at 1 April 2026
- Housing Delivery Test result, the 2025 measurement
- Community Infrastructure Levy rates for new homes, in 4 zones
- 4 Article 4 directions, and what each removes
- 19 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in North Kesteven?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from North Kesteven’s own published plans and pages on 12 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.
