GoPlanner

Councils

North Tyneside local plan

The plans North Tyneside decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • North Tyneside Local Plan (new Local Plan to 2042/43), to 2042/43

    Publication Draft (Regulation 19) consultation held from 28 September 2026 to 11:59pm on Thursday 12 November 2026, now closed, for "Around 18,360 new homes by 2042/43" (https://haveyoursay.northtyneside.gov.uk/publication-draft-local-plan). Earlier steps: Vision, Issues and Options consultation, August to October 2025; Initial Draft Local Plan (Regulation 18) consultation, 14 January to 25 February 2026 (https://haveyoursay.northtyneside.gov.uk/local-plan-consultation-feedback; https://www.northtyneside.gov.uk/news/2026/next-phase-local-plan-consultation-opens). Prepared under the 2004 Act's system, not the new one. Next: the council's planning policy timetable page says that, with the Local Development Scheme updated in November 2026, it "now expects to submit the North Tyneside Local Plan for examination no later than 28 February 2027" (earlier December 2026), with examination 2027/28 and adoption anticipated in 2028 (https://www.northtyneside.gov.uk/residents/planning/planning-policy/planning-policy-timetable-and-consultation-guidance). Publication Draft: https://haveyoursay.northtyneside.gov.uk/52597/widgets/159552/documents/112370.

Free with any account

North Tyneside’s figures

  • Five-year housing land supply, measured at 1 April 2024
  • Housing Delivery Test result, the 2025 measurement
  • Community Infrastructure Levy rates for new homes, in 5 zones
  • 8 Article 4 directions, and what each removes
  • What new homes pay towards protected habitat sites
  • How the plan draws its settlements

Checking a property in North Tyneside?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from North Tyneside’s own published plans and pages on 28 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.