North Warwickshire Borough Council local plan
The plans North Warwickshire Borough Council decides planning applications against, and how far its next plan has got.
Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.
This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.
Adopted plans
- North Warwickshire Local Plan, adopted 29 September 2021, 2011 to 2033
- Warwickshire Minerals Local Plan 2018-2032, adopted 22 July 2022, 2018 to 2032
- Warwickshire Waste Core Strategy Development Plan Document, adopted 9 July 2013, up to 2028
Emerging plans
- North Warwickshire Local Plan 2026 (Local Plan Review), 2025 to 2045
Regulation 19 pre-submission consultation under way, 16 October to 26 November 2026, described as the "final stage of consultation before the new Local Plan is submitted to the Secretary of State" (Local Plan page, https://www.northwarks.gov.uk/forward-planning/local-plan-north-warwickshire; document "North Warwickshire Local Plan 2026 Regulation 19 Final Pre-submission Draft", September 2026, which "will supersede the adopted North Warwickshire Local Plan 2021", https://www.northwarks.gov.uk/downloads/file/4031/final-reg-19-local-plan-2026-no-track-changes-15102026-for-website-1-). Completed steps: Issues and Options (Regulation 18) consultation 28 November 2025 to 21 January 2026, over 470 respondents (Local Plan Review 2026 page, https://www.northwarks.gov.uk/forward-planning/local-plan-north-warwickshire/6; the LDS gives 18 November 2025 to 14 January 2026); second Regulation 18 (draft plan with proposed allocations) 9 July to 19 August 2026 (Reg 19 document). Next: submission planned for November 2026 on close of the Regulation 19 consultation (Local Development Scheme March 2026, https://www.northwarks.gov.uk/downloads/file/2926/local-development-scheme-march-2026-); examination and adoption undated.
Free with any account
North Warwickshire Borough Council’s figures
- Five-year housing land supply, measured at 1 April 2025
- Housing Delivery Test result, the 2025 measurement
- Whether the Community Infrastructure Levy is charged
- 10 Article 4 directions, and what each removes
- 12 neighbourhood plans, with the dates they were made
- How the plan draws its settlements
Checking a property in North Warwickshire Borough Council?
This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.
Check a propertyWhere this comes from
GoPlanner’s plan register, compiled from North Warwickshire Borough Council’s own published plans and pages on 22 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.