GoPlanner

Councils

Nuneaton and Bedworth Borough Council local plan

The plans Nuneaton and Bedworth Borough Council decides planning applications against, and how far its next plan has got.

Compiled by GoPlanner, with AI, from the council’s own published pages. It has not yet been reviewed by a GoPlanner planner: check anything you rely on against the council’s own pages, which each plan and figure links to.

This page is about the council’s plans, not about any property. Whether a property is inside an Article 4 direction, a settlement boundary, a CIL zone or a neighbourhood plan’s area is settled by the council’s own maps. A property’s own constraints are in its free summary.

Adopted plans

Emerging plans

  • Nuneaton and Bedworth Borough Local Plan (NBBLP)

    Started under the 2026 plan-making system: notice of intention to commence plan preparation published 29 June 2026, covering "the administrative area of Nuneaton and Bedworth Borough Council" (https://www.nuneatonandbedworth.gov.uk/adopted-borough-plan/new-local-plan-%E2%80%93-nuneaton-bedworth-borough-local-plan/2); scoping consultation and call for sites "now closed (29 June 2026 - 10 August 2026)"; the Gateway 1 self-assessment summary is published on the council's site, the timetable giving 30 October 2026 for it (https://www.nuneatonandbedworth.gov.uk/adopted-borough-plan/new-local-plan-%E2%80%93-nuneaton-bedworth-borough-local-plan/4). Next, per the Local Plan Timetable of 29 June 2026 (https://www.nuneatonandbedworth.gov.uk/downloads/file/2602/local-plan-timetable-29-06-26-): plan content and evidence consultation 28 June to 9 August 2027; Gateway 2 29 November 2027; proposed plan consultation 3 April to 29 May 2028; Gateway 3 4 September 2028; submission 30 October 2028; adoption considered 30 April 2029. No plan period stated.

Free with any account

Nuneaton and Bedworth Borough Council’s figures

  • Five-year housing land supply, measured at 1 April 2026
  • Housing Delivery Test result, the 2025 measurement
  • Whether the Community Infrastructure Levy is charged
  • 5 Article 4 directions, and what each removes
  • How the plan draws its settlements

Checking a property in Nuneaton and Bedworth Borough Council?

This page doesn’t look at any property. Mark the building on the map and we’ll check its own planning constraints (conservation area, listing, flood zone, Article 4 and more) in a free summary, in about a minute.

Check a property

Where this comes from

GoPlanner’s plan register, compiled from Nuneaton and Bedworth Borough Council’s own published plans and pages on 22 November 2026. No GoPlanner planner has reviewed it yet. Each plan links to the council’s own page for it. Plans change: the council’s planning policy pages are the authority, and a plan’s stage is as it stood when the entry was last checked.